Answered step by step
Verified Expert Solution
Link Copied!

Question

1 Approved Answer

Semiautomatic mixers are used in a paint plant. It takes 5 minutes for an operation to load the appropriate pigments and paint base into a

Semiautomatic mixers are used in a paint plant. It takes 5 minutes for an operation to load the appropriate pigments and paint base into a mixer. Mixers run automatically and then automatically dispense paint into 75-gallon drums, which takes 25 minutes to complete. Operators clean the mixers between batches which takes 2 minutes. Between batches, an operator prepares empty drums to position them for filling which takes 3 minutes. Filled drums are transported automatically by a conveyor to a test area before being stored.
Mixers are located close enough for travel between mixers to be negligible.

a. What is the maximum number of mixers that can be assigned to an operator without creating idle time for the mixers?

b. If the operator cost is $17/hour and the machine cost is $28/hour, what assignment of mixers to operators will minimize the cost per batch produced?

Step by Step Solution

There are 3 Steps involved in it

Step: 1

a Maximum Mixers per Operator To calculate the maximum mixers per operator without idle timewe need to analyze the cycle time of a single mixer and co... blur-text-image

Get Instant Access to Expert-Tailored Solutions

See step-by-step solutions with expert insights and AI powered tools for academic success

Step: 2

blur-text-image_2

Step: 3

blur-text-image_3

Ace Your Homework with AI

Get the answers you need in no time with our AI-driven, step-by-step assistance

Get Started

Recommended Textbook for

Financial Accounting Tools for Business Decision Making

Authors: Paul D. Kimmel, Jerry J. Weygandt, Donald E. Kieso, Barbara Trenholm, Wayne Irvine

5th Canadian edition

978-1118024492

More Books

Students also viewed these General Management questions