Question
Sharpton Fabricators Corporation manufactures a variety of parts for the automotive industry. The company uses a job-order costing system with a plantwide predetermined overhead rate
Sharpton Fabricators Corporation manufactures a variety of parts for the automotive industry. The company uses a job-order costing system with a plantwide predetermined overhead rate based on direct labour-hours. On December 10, 2015, the companys controller made a preliminary estimate of the predetermined overhead rate for 2016. The new rate was based on the estimated total manufacturing overhead cost of $3,402,000 and the estimated 63,000 total direct labour-hours for 2016:
Predetermined overhead rate = 3,402,000/63,000 = $54 per direct labour hours
This new predetermined overhead rate was communicated to top managers in a meeting on December 11. The rate did not cause any comment because it was within a few cents of the overhead rate that had Page 190been used during 2015. One of the subjects discussed at the meeting was a proposal by the production manager to purchase an automated milling machine centre built by Central Robotics. The president of Sharpton Fabricators, Kevin Reynolds, agreed to meet with the regional sales representative from Central Robotics to discuss the proposal.
On the day following the meeting, Reynolds met with Jay Warner, Central Robotics sales representative. The following discussion took place:
-
Reynolds: Lisa Winter, our production manager, asked me to meet with you since shes interested in installing an automated milling machine centre. Frankly, Im skeptical. Youre going to have to show me this isnt just another expensive toy for Lisas people to play with.
-
Warner: That shouldnt be too difficult, Kevin. The automated milling machine centre has three major advantages. First, its much faster than the manual methods youre using. It can process about twice as many parts per hour as your current milling machines. Second, its much more flexible. There are some up-front programming costs, but once those have been incurred, almost no setup is required on the machines for standard operations. You just punch in the code of the standard operation, load the machines hopper with raw material, and the machine does the rest.
-
Reynolds: Yeah, but what about cost? Having twice the capacity in the milling machine area wont do us much good. That centre is idle much of the time, anyway.
-
Warner: I was getting there. The third advantage of the automated milling machine centre is lower cost. Winters and I looked over your present operations, and we estimated that the automated equipment would eliminate the need for about 6,000 direct labour-hours a year. What is your direct labour cost per hour?
-
Reynolds: The wage rate in the milling area averages about $32 per hour. Fringe benefits raise that figure to about $41 per hour.
-
Warner: Dont forget your overhead.
-
Reynolds: Next year the overhead rate will be about $54 per direct labour-hour.
-
Warner: So including fringe benefits and overhead, the cost per direct labour-hour is about $95.
-
Reynolds: Thats right.
-
Warner: Since you can save 6,000 direct labour-hours per year, the cost savings would amount to about $570,000 a year, and our 60-month lease plan would require payments of only $348,000 per year.
-
Reynolds: Sold! When can you install the equipment?
Shortly after this meeting, Reynolds informed the companys controller of the decision to lease the new equipment, which would be installed over the Christmas vacation period. The controller realized that this decision would require a recomputation of the predetermined overhead rate for 2016, since the decision would affect both the manufacturing overhead and the direct labour-hours for the year. After talking with both the production manager and the sales representative from Central Robotics, the controller discovered that in addition to the annual lease cost of $348,000, the new machine would also require a skilled technician/programmer who would have to be hired at a cost of $50,000 per year to maintain and program the equipment. Both of these costs would be included in factory overhead. There would be no other changes in total manufacturing overhead cost, which is almost entirely fixed. The controller assumed that the new machine would result in a reduction of 6,000 direct labour-hours for the year from the levels that had initially been planned.
When the revised predetermined overhead rate for 2016 was circulated among the companys top managers, there was considerable dismay.
Required:
-
Recompute the predetermined rate assuming that the new machine will be installed. Explain why the new predetermined overhead rate is higher (or lower) than the rate that was originally estimated for 2016.
-
What effect (if any) would this new rate have on the cost of jobs that do not use the new automated milling machine?
-
Why would managers be concerned about the new overhead rate?
-
After seeing the new predetermined overhead rate, the production manager admitted that he probably wouldnt be able to eliminate all of the 6,000 direct labour-hours. He had been hoping to accomplish the reduction by not replacing workers who retire or quit, but that would not be possible. As a result, the real labour savings would only be about 2,000 hoursone worker. In the light of this additional information, evaluate the original decision to acquire the automated milling machine from Central Robotics.
Step by Step Solution
There are 3 Steps involved in it
Step: 1
Get Instant Access to Expert-Tailored Solutions
See step-by-step solutions with expert insights and AI powered tools for academic success
Step: 2
Step: 3
Ace Your Homework with AI
Get the answers you need in no time with our AI-driven, step-by-step assistance
Get Started