Shasta Fixture Company manufactures faucets in a small manufacturing facility. The faucets are made from brass, Manu employees. Each employee presently provides 35 hours of labor per week. Information about a production week is as fo Standard wage per hour $17.40 Standard labor time per unit 15 min. Standard number of lbs. of brass 1.9 lbs. Standard price per lb. of brass $11.00 Actual price per 1b. of brass $11.25 Actuallbs. of brass used during the week 12,916 lbs. Number of units produced during the week 6,600 Actual wage per hour $17.92 Actual hours for the week (30 employees x 35 hours) 1,050 Required: a. Determine the standard cost per unit for direct materials and direct labor, Round the cost per unit to two decimal pla Direct materials standard cost per unit Direct labor standard cost per unit Total standard cost per unit 1. Determine the direct materials price variance, direct materials quantity variance, and total direct materials cost variance. R answers to the nearest whole dollar. Enter a favorable variance as a negative number using a minus sign and an unfavora Required: 1.050 a. Determine the standard cost pe for direct materials and direct labor Round the cost perto two decimal places. Direct materials standard cost per un Direct labor standard cost per unit Total standard cost per unit 5. Determine the Grect materiais pece vacance, Great materials cavance, and total directo answers to the nearest whole dollar. Etter a favorable variance as a negative sumber and make dy as a positive number Direct Materials Price Variance Direct Materials Quantity Variance Total Direct Materials cose variance c Determine the direct laborate variance, Grect labore stance, and total Grect labor cost aranceRound your answers to the nearest whole dollar. Enter a favorable variance as a negative berasing a mission and an advance number Direct Labor Rate variance Direct Labor Time Variance Total Direct Labor Cast Variance