Shift time (Design Capacity)= 10 hours Meal Break-Lunch time (Unpaid time-1 hour) Cycle time (Nominal (theoretical) min/unit)=15min/unit Short breaks (Tea time) -9.45-10.00 and 14.15-14.30
Shift time (Design Capacity)= 10 hours Meal Break-Lunch time (Unpaid time-1 hour) Cycle time (Nominal (theoretical) min/unit)=15min/unit Short breaks (Tea time) -9.45-10.00 and 14.15-14.30 Downtime (time/day the sum of all the interruptions): 1 hour Number of total pieces= 37 unit Number of defects-3 unit a) Fill the OEE table with the given information above Shift length hours Meal Break Time(min) unit Approach I 1 0 Available time Short Breaks 2*15min tea time Downtime: min/day Total Production time (Available time)= Number of pieces (total) Number of defects: Good pieces Nominal unit 11 time = 0 0 =Availability =Efficiency =Performance of the cell =Throughput yield (TPY) =OEE
Step by Step Solution
There are 3 Steps involved in it
Step: 1
Get Instant Access to Expert-Tailored Solutions
See step-by-step solutions with expert insights and AI powered tools for academic success
Step: 2
Step: 3
Ace Your Homework with AI
Get the answers you need in no time with our AI-driven, step-by-step assistance
Get Started