Answered step by step
Verified Expert Solution
Question
1 Approved Answer
show all work 5. Job cost sheets for Isabella Manufacturing are as follows: Job No 210 Quantity 1,500 Date Direct Materials 9,000 8,500 Direct Labor
show all work
5. Job cost sheets for Isabella Manufacturing are as follows: Job No 210 Quantity 1,500 Date Direct Materials 9,000 8,500 Direct Labor 8,000 Manufacturing Overhead 12,000 July 1 8 10 15 25 10,000 5,500 20,000 Job No 211 Quantity 1,200 Direct Materials 5,000 9,000 Direct Labor 6,000 Manufacturing Overhead 9,000 Date July 1 10 15 20 27 8,000 7,000 12,000 Instructions (a) Answer the following questions. 1. What was the balance in Work in Process Inventory on July 1 if these were the only unfinished jobs? 2. What was the predetermined overhead rate in June if overhead was applied on the basis of direct labor cost? 3. If July is the start of a new fiscal year and the overhead rate is 20% higher than in the preceding year, how much overhead should be applied to Job 210 in July? 4. Assuming Job 210 is complete, what is the total and unit cost of the job? 5. Assuming Job 211 is the only unfinished job at July 31, what is the balance in Work in Process Inventory on this date? (b) Journalize the summary entries to record the assignment of costs to the jobs in July. (Note: Make one entry in total for each manufacturing cost element.)Step by Step Solution
There are 3 Steps involved in it
Step: 1
Get Instant Access to Expert-Tailored Solutions
See step-by-step solutions with expert insights and AI powered tools for academic success
Step: 2
Step: 3
Ace Your Homework with AI
Get the answers you need in no time with our AI-driven, step-by-step assistance
Get Started