Answered step by step
Verified Expert Solution
Link Copied!

Question

1 Approved Answer

SIMU18 Deterministic Model Model the production system shown in Figure 1. Parts arrive at a production area with a fixed time of 5 minutes. The

image text in transcribed

SIMU18 Deterministic Model Model the production system shown in Figure 1. Parts arrive at a production area with a fixed time of 5 minutes. The production process consists of two operations; drilling and grinding. There are 3 drill stations working in parallel and 2 grind stations working in parallel. Upon arrival to the drill area, a job is processed for a fixed time of 12 minutes. The job is then processed on the grinding machines with a fixed process time of 10.5 minutes. Figure 1 shows the layout for the system. Both storage areas have infinite capacity. Transportation times between resources are assumed to be negligible. 1. Model the system with Simuls 2. Run a single replication for 24 hours having a warm up period of 3 hours. 3. How many parts are produced by this system in the simulation? 4. From this model, would you believe that the company should invest in one additional Drill machine or an addition Grind one? Briefly explain your

Step by Step Solution

There are 3 Steps involved in it

Step: 1

blur-text-image

Get Instant Access to Expert-Tailored Solutions

See step-by-step solutions with expert insights and AI powered tools for academic success

Step: 2

blur-text-image_2

Step: 3

blur-text-image_3

Ace Your Homework with AI

Get the answers you need in no time with our AI-driven, step-by-step assistance

Get Started

Recommended Textbook for

Retailing Management

Authors: Michael Levy, Barton A Weitz

8th Edition

0073530026, 9780073530024

More Books

Students also viewed these General Management questions