Question
Simulation Systems Modeling (Software used: Rockwall ARENA) concepts 1. A laundromat has 15 washing machines, 5 dryers, a bill changer and a soap vending machine.
Simulation Systems Modeling (Software used: Rockwall ARENA) concepts
1. A laundromat has 15 washing machines, 5 dryers, a bill changer and a soap vending machine. There is no attendant
a. Give system components,
b. Give system parameters(some in description, some not),
c. Relationships,
d. variable
2. A production process has two machines in series. After a job has been processed on the second machine, the operator examines the finished part and determines if it is good or defective; defective parts are reprocessed through both machines; the probability of a defective part is 0.1. Parts arrive every 5 to 7 (uniform distribution) minutes; each machine has normally distributed processing times with a mean of 5 minutes and a standard deviation of 1 minute.
a. Give the ARENA model
b. what can be said about the theoretical utilization of the servers
please help its concepts based and drawing Thanks!
Step by Step Solution
There are 3 Steps involved in it
Step: 1
Get Instant Access to Expert-Tailored Solutions
See step-by-step solutions with expert insights and AI powered tools for academic success
Step: 2
Step: 3
Ace Your Homework with AI
Get the answers you need in no time with our AI-driven, step-by-step assistance
Get Started