Single Plantwide and Multiple Production Department Factory Overhead Rate Methods and Product Cost Distortion Eclipse Motor Company manufactures two types of specialty electric motors, a

  1. Single Plantwide and Multiple Production Department Factory Overhead Rate Methods and Product Cost Distortion

    Eclipse Motor Company manufactures two types of specialty electric motors, a commercial motor and a residential motor, through two production departments, Assembly and Testing. Presently, the company uses a single plantwide factory overhead rate for allocating factory overhead to the two products. However, management is considering using the multiple production department factory overhead rate method. The following factory overhead was budgeted for Eclipse:

    Assembly Department $280,000
    Testing Department 800,000
    Total $1,080,000

    Direct machine hours were estimated as follows:

    Assembly Department 4,000 hours
    Testing Department 5,000
    Total 9,000 hours

    In addition, the direct machine hours (dmh) used to produce a unit of each product in each department were determined from engineering records, as follows:

    Commercial Residential
    Assembly Department 2.0 dmh 3.0 dmh
    Testing Department 6.0 1.5
    Total machine hours per unit 8.0 dmh 4.5 dmh

    a. Determine the per-unit factory overhead allocated to the commercial and residential motors under the single plantwide factory overhead rate method, using direct machine hours as the allocation base.

    Commercial $fill in the blank 1 per unit
    Residential $fill in the blank 2 per unit

    b. Determine the per-unit factory overhead allocated to the commercial and residential motors under the multiple production department factory overhead rate method, using direct machine hours as the allocation base for each department.

    Commercial $fill in the blank 3 per unit
    Residential $fill in the blank 4 per unit

    c. Recommend to management a product costing approach, based on your analyses in (a) and (b).

    1. The management should consider multiple production department factory overhead rate methods, because this method calculates the cost more accurately and considers the fact that commercial products use more costly overheads than residential products.

    2. The management should consider single plantwide factory overhead rate methods, because this method calculates the cost more accurately and considers the fact that the overheads are applied evenly based on the direct labor hours.

    3. The management could consider either multiple production department factory overhead rate method or the single plantwide rate, as both these methods have the same effect on the final costs.

    123

Step by Step Solution

There are 3 Steps involved in it

Step: 1

blur-text-image

Get Instant Access to Expert-Tailored Solutions

See step-by-step solutions with expert insights and AI powered tools for academic success

Step: 2

blur-text-image_2

Step: 3

blur-text-image_3

Ace Your Homework with AI

Get the answers you need in no time with our AI-driven, step-by-step assistance

Get Started

Recommended Textbook for

Financial and Managerial Accounting

Authors: Carl S. Warren, James M. Reeve, Jonathan Duchac

13th edition

1285866304, 978-1285866307

More Books

Students also viewed these Accounting questions

Question

What is involved in the administration of a labor agreement?

Answered: 1 week ago

Question

What are topics included in virtually all labor agreements?

Answered: 1 week ago