Question
Six jobs are waiting for processing at the milling station (F). It's on the problem page. There is an average of 5-star waiting at each
Six jobs are waiting for processing at the milling station (F). It's on the problem page. There is an average of 5-star waiting at each station. Assuming that the time now is 20: First Requirement, First Service Provider (FCFS), Loosiness Per Remaining Operation (S / RO), Most Transactions Remaining Transaction Remaining (MOPNR), Minimum Total Work (LTWK) and COVERT vary accordingly. .
Determine the sequences for each of the First Come, First Served (FCFS), Slack per Remaining Operation (S / RO), Most Operations Remaining (MOPNR), Least Total Work (LTWK) and COVERT determitanion distribution rules.
work System arrival 10 1 M, 5 0 milling, cogunter arrival 10 0 12 18 12 17 Operation (machine. Rij) 1 2 3 7,5 T. 3 F,3 B,4 1,1 M,4 F,6 1,3 F,7 1,3 F,10 B,4 1,3 1,4 F,8 date 30 20 35 26 45 29 5 7 12 2 4 6 work System arrival 10 1 M, 5 0 milling, cogunter arrival 10 0 12 18 12 17 Operation (machine. Rij) 1 2 3 7,5 T. 3 F,3 B,4 1,1 M,4 F,6 1,3 F,7 1,3 F,10 B,4 1,3 1,4 F,8 date 30 20 35 26 45 29 5 7 12 2 4 6Step by Step Solution
There are 3 Steps involved in it
Step: 1
Get Instant Access to Expert-Tailored Solutions
See step-by-step solutions with expert insights and AI powered tools for academic success
Step: 2
Step: 3
Ace Your Homework with AI
Get the answers you need in no time with our AI-driven, step-by-step assistance
Get Started