Skilled labour at a manufacturing plant is in short supply, and all available skilled labour time is fully utilised. A customer has asked for
Skilled labour at a manufacturing plant is in short supply, and all available skilled labour time is fully utilised. A customer has asked for a special job that will cost $400 in direct materials and will require 15 hours of skilled labour time. Skilled labour costs $8 per hour and variable production overhead is $2 per hour. Fixed production overheads are absorbed at a rate of $20 per skilled labour hour. If the job is undertaken the skilled labour will be withdrawn from work on making items that earn a contribution of $25 per skilled labour hour. What is the minimum price that should be charged if this special job is undertaken? O $775 O $895 $925 $1,225 O
Step by Step Solution
3.29 Rating (149 Votes )
There are 3 Steps involved in it
Step: 1
The detailed answer for the above question is provided below To calculate the minimum price that sho...See step-by-step solutions with expert insights and AI powered tools for academic success
Step: 2
Step: 3
Ace Your Homework with AI
Get the answers you need in no time with our AI-driven, step-by-step assistance
Get Started