Question
Smooth Enterprises manufactures two products, boat wax and car wax, in two departments, Mixing and Packaging. The Mixing Department has 900 hours per month available
Smooth Enterprises manufactures two products, boat wax and car wax, in two departments, Mixing and Packaging. The Mixing Department has 900 hours per month available while the Packaging Department has 1,100 hours per month available. Production of the two products cannot exceed 44,000 pounds. Data on the two products follow:
Product | Contribution Margin (per 100 pounds) | Hours per 100 pounds of Output: Mixing (M) | Hours per 100 Pounds of Output: Packaging (P) |
---|---|---|---|
Boat wax (B) | $ 100 | 7.0 | 4.2 |
Car wax (C) | $130 | 2.7 | 5.0 |
The Mixing Department (M) constraint for the Smooth linear program would be (where B and C are expressed in 100-pound units of output):
Multiple Choice
2.7M + 5P 44,000.
7B + 2.7C 900.
7B + 2.7C 900.
7B + 2.7C = 900.
9.7M + 9.2P 44,000.
Smooth Enterprises manufactures two products, boat wax and car wax, in two departments, Mixing and Packaging. The Mixing Department has 900 hours per month available while the Packaging Department has 1,100 hours per month available. Production of the two products cannot exceed 44,000 pounds. Data on the two products follow: The Mixing Department (M) constraint for the Smooth linear program would be (where B and C are expressed in 100 -pound units of output): Multiple Choice 2.7M+5P44,000. 7B+2.7C900 7B+2.7C900 7B+2.7C=900. 9.7M+9.2P44,000Step by Step Solution
There are 3 Steps involved in it
Step: 1
Get Instant Access to Expert-Tailored Solutions
See step-by-step solutions with expert insights and AI powered tools for academic success
Step: 2
Step: 3
Ace Your Homework with AI
Get the answers you need in no time with our AI-driven, step-by-step assistance