Answered step by step
Verified Expert Solution
Link Copied!

Question

1 Approved Answer

software engineer Assume that the annual change traffic for maintenance (modification) of an embedded software system (compressing 72 KSSI at the beginning of year 1)

image text in transcribedsoftware engineer

Assume that the annual change traffic for maintenance (modification) of an embedded software system (compressing 72 KSSI at the beginning of year 1) would be about 15% per year (6% is deleted code; 5% is the modified code; and 4% is the new code). Assume the cost driver (CD) of the s system is nominal 1.5, and complexity factor (CF)is 0.93 for the modification. What would be the modification cost for year 1 if one MM costs QR I000? How many staff should be recruited for this project if it is to be completed within 3 months in year 1? What would be the total size of the software in terms of KDSI (KSSI) after 3 years of maintenance with the same rate of annual change in every year? You must show every step of your calculations. Only providing final computed value will attract 0 grade

Step by Step Solution

There are 3 Steps involved in it

Step: 1

blur-text-image

Get Instant Access to Expert-Tailored Solutions

See step-by-step solutions with expert insights and AI powered tools for academic success

Step: 2

blur-text-image

Step: 3

blur-text-image

Ace Your Homework with AI

Get the answers you need in no time with our AI-driven, step-by-step assistance

Get Started

Recommended Textbook for

Sams Teach Yourself Beginning Databases In 24 Hours

Authors: Ryan Stephens, Ron Plew

1st Edition

067232492X, 978-0672324925

More Books

Students also viewed these Databases questions