Answered step by step
Verified Expert Solution
Link Copied!

Question

1 Approved Answer

Stage 1 ABC For Machine Shop: Assigning Costs to Activity As the chief engineer of a small fabrication shop, Brenda Tolliver refers to herself as

image text in transcribedimage text in transcribed

Stage 1 ABC For Machine Shop: Assigning Costs to Activity As the chief engineer of a small fabrication shop, Brenda Tolliver refers to herself as a "jack-of-all-trades." When an order for a new product comes in, Brenda must do the following: 1. Design the product to meet customer requirements. 2. Prepare a bill of materials (a list of materials required to produce the product). 3. Prepare an operations list (a sequential list of the steps involved in manufacturing the product). Each time the foundry manufactures a batch of the product, Brenda must perform these activities: 1. Schedule the job. 2. Supervise the setup of machines that will work on the job. 3. Inspect the first unit produced to verify that it meets specifications. 2014 Brenda supervises the production employees who perform the actual work on individual units of product. She is also responsible for employee training, ensuring that production facilities are in proper operating condition, and attending professional meetings, Brenda's estimates (in percent) of time spent on each of theses activities last year are as follows: Unit level activities: Supervising production Batch level activities: Scheduling jobs 2144 Supervisirg setups Inspecting first units Product level activities: erinin Designing product 155 Preparing bills of me materials 254 299 Preparing operations lists Facility level activities: Training employees Maintaining facility Attending professional meetings 155 100% Assuming Brenda Tolliver's salary is $123,000 per year, determine the dollar amount of her salary assigned to unit-, batch-products and facility-level activities, Assuming Brenda Tolliver's salary is $123,000 per year, determine the dollar amount of her salary assigned to unit-, batch-, product-, and facility- level activities. % of Time Spent on Activity Assignment of Salary Unit level: % Supervising production Total % $ Batch level: % % Job scheduling Supervising setup First unit inspection Total % % Product level: % % % % Product design Preparing bills of materials Preparing operations lists Total Facility level: Employee training Facility maintenance Attending professional meetings Total % % % % Grand total % $

Step by Step Solution

There are 3 Steps involved in it

Step: 1

blur-text-image

Get Instant Access to Expert-Tailored Solutions

See step-by-step solutions with expert insights and AI powered tools for academic success

Step: 2

blur-text-image

Step: 3

blur-text-image

Ace Your Homework with AI

Get the answers you need in no time with our AI-driven, step-by-step assistance

Get Started

Recommended Textbook for

Cost Accounting A Decision Emphasis

Authors: Germain Boer, Debra Jeter

5th Edition

0759341559, 978-0759341555

More Books

Students also viewed these Accounting questions

Question

OUTCOME 1 Explain the reasons for equity-related legislation.

Answered: 1 week ago