Question
STATS 131-B NEED THIS ASAP. 5MINS! READ COMMENTS FOR INSTRUCTIONS! PLEASE SKIP IF YOU CANT FINISH! I WILL REPORT THOSE WHO WILL FLAG THIS. THANKS
STATS 131-B
NEED THIS ASAP. 5MINS!
READ COMMENTS FOR INSTRUCTIONS!
PLEASE SKIP IF YOU CANT FINISH!
I WILL REPORT THOSE WHO WILL FLAG THIS. THANKS
"Attribute Charts - Choice between Attributes and Variable Control Charts - 1".
1. The number of defects per unit of a casting process output, is plotted on _____________ chart.
a) x bar
b) s-chart
c) u-chart
d) p-chart
2. What type of control chart can be used to plot "number of defectives in the output of a process for making a machine part" data?
a) p-chart
b) c-chart
c) u-chart
d) s-chart
3. Which of the control chart is used to find out variability in the data?
a) s-chart
b)x-chart
c) p-chart
d) c-chart
4. Which of the charts are more efficient to find out variability in the data when the sample size is more than 10?
a) R-chart
b) c-chart
c) s-chart
d) p-chart
5. Which of these is an advantage of attribute control chart?
a) Much useful information about the process performance can be gathered
b) Mean and variability is obtained directly
c) One quality characteristic is observed at a time
d) Several quality characteristics can be considered jointly
6. Which of these is an advantage of variable control chart?
a) Numerous quality characteristics considered at a time
b) To achieve the information very easily about the mean and variability
c) To have analyses of units nonconforming
d) To analyze the defects in one unit
7. X bar and R charts are __________ indicators of trouble.
a) Trailing
b) Inferior
c) Leading
d) Secondary
8. The efficiency of variable control charts is _________ the efficiency of the p-charts when p is small and far away from 0.5.
a) Lesser than
b) More than
c) Equal to
d) Non-predictable
9. The efficiency of p-charts is __________ the efficiency of the x bar and R charts when p is closer to 0.5.
a) Equal to
b) More than
c) Less than
d) Non-predictable
10. Which of these is most economical in long term?
a)xAnd R charts
b) c-chart
c) p-chart
d) u-chart
11. When a change in product specification is desired, which of these control charts should be used?
a) p-charts
b)xAnd R charts
c) c-charts
d) u-charts
12. When we want to troubleshoot the out-of-control process, we use _________ control charts.
a)x
b) p
c) c
d) u
13. In regulated industries, where process stability and process capability must be continually demonstrated __________ charts are used.
a)xAnd s
b) p
c) c
d) u
14. Before choosing which CTQ-characteristic to be controlled, control chart must be chosen.
a) True
b) False
15. Proper type of control charts to be prepared, must be chosen after choosing the point in the process at which the control charts will be implemented.
a) True
b) False
Step by Step Solution
There are 3 Steps involved in it
Step: 1
Get Instant Access to Expert-Tailored Solutions
See step-by-step solutions with expert insights and AI powered tools for academic success
Step: 2
Step: 3
Ace Your Homework with AI
Get the answers you need in no time with our AI-driven, step-by-step assistance
Get Started