Answered step by step
Verified Expert Solution
Link Copied!

Question

1 Approved Answer

Steampunk Corporation has the following predicted indirect costs and cost drivers for 2019 for the given activity cost pools: NEED ALL PARTS. A, B AND

Steampunk Corporation has the following predicted indirect costs and cost drivers for 2019 for the given activity cost pools:


NEED ALL PARTS. A, B AND C image text in transcribed
image text in transcribed
image text in transcribed
Steampunk Corporation has the following predicted indirect costs and cost drivers for 2019 for the given activity cost pools: Fabrication Finishing Department Department Cost Driver Maintenance 196,000 48,000 Machine hours Material handling 144,000 72.000 Material moves Machine 336.000 24,000 Machine setups Inspection 120,000 Inspection hours Total $ 576,000 $264.000 The following activity predictions were also made for the year: Fabrication Finishing Department Department Machine hours 5.000 2,500 Material moves 1,500 750 Machine setups 25 respection hours 500 It is assumed that the cost per unit of activity for a given activity does not vary between departments. Steampunk's president, Abner Punk, is trying to evaluate the company's product mix strategy regarding two of its product models, SW100 and SG150. The company has been using a company wide overhead rate based on machine hours but is considering switching to either department rates of activity-based rates. The production manager has provided the following data for the production of a batch of 100 units for each of these models: SW100 SG150 Direct materials com $32.000 48,000 Direct labor cost $12,800 39,600 Machine hours (Fabrication 250 350 Machine hours (Finishing 100 50 Materials moves 20 Machine stups 5 10 Inspection hours 15 a. Determine the cost of one unit each of SW100 and SG150, assuming a company-wide overhead rate is used based on total machine hours. Round rate to two decimal places. Overhead rate based on total machine hours: $ per machine hour Machine hours Fabrication 250 350 Machine hours Finishing 100 50 Materials moves 20 40 Machine setups 5 10 Inspection hours 15 30 a. Determine the cost of one unit each of SW100 and 56150, assuming a company wide overhead rate is used based on total machine hours. Round rate to two decimal places. Overhead rate based on total machine hours: $ per machine hour Use rounded overhead rate calculated about for calculations below. Round cost answers to the nearest whole number. Round cost per unit to two decimal places. Product Costs per Unit SW100 SG150 Direct materials Oct Manufacturing overhead Total cost per batch $ Number of units per batch Cost per unit 5 b. Determine the cost of one unit of SW100 and SG150, assuming department overhead rates are used. Overhead is assigned based on machine hours in both departments Round to two decimal places, if applicable. Overhead rate based on machine hours for Fabrication Dept.: 5 per machine hour Overhead rate based on machine hours for Finishing Dept: $ per machine hour. Use rounded overhead rate calculated above for calculations below. Round cost answers to the nearest whole number, when needed. Round cost per unit to two decimal places, if needed Product Costs per Unit SW100 SG150 Direct materials Director Manufacturing overhead: Fabrication Dept Finishing Dept E DUSULUI JUULIPUU U Medy Overhead rate based on machine hours for Finishing Dept: per machine hour. $ Use rounded overhead rate calculated above for calculations below. Round cost answers to the nearest whole number, when needed. Round cost per unit to two decimal places, if needed Product Costs per Unit SW100 SG150 Direct materials Direct labor Manufacturing overhead Fabrication Dept Finishing Dept Total cost per batch Number of units per batch Cost per unit $ $ c. Determine the cost of one unit of SW100 and SG150, assuming activity based overhead rates are used for maintenance, materials handling machine setup, and inspection activities Round rate to two decimal places, if applicable Activity based overhead rates Maintenance Materials handling 5 Machine Inspection activities Use rounded overhead rate calculated above for calculations below. Round cost answers to the nearest whole number, when needed. Round cost per unit to two decimal places, if needed Product Costs per Unit SW100 SG150 Direct materials Direct labor Manufacturing overhead: Maintenance activity Materials handling activity Machine setups activity Inspections activity Total cost per batch 5 Number of units per batch 90 80 888 EB FS 8

Step by Step Solution

There are 3 Steps involved in it

Step: 1

blur-text-image

Get Instant Access to Expert-Tailored Solutions

See step-by-step solutions with expert insights and AI powered tools for academic success

Step: 2

blur-text-image_2

Step: 3

blur-text-image_3

Ace Your Homework with AI

Get the answers you need in no time with our AI-driven, step-by-step assistance

Get Started

Recommended Textbook for

Energy Management Conservation And Audits

Authors: Anil Kumar, Om Prakash, Prashant Singh Chauhan, Samsher Gautam

1st Edition

0367494930, 978-0367494933

More Books

Students also viewed these Accounting questions