Answered step by step
Verified Expert Solution
Question
1 Approved Answer
Sundazzler Designs has prepared the annual manufacturing budget for its line of specialty pergolas. It estimated annual production of 3,000 pergolas during 2022. Each pergola
Sundazzler Designs has prepared the annual manufacturing budget for its line of specialty pergolas. It estimated annual production of 3,000 pergolas during 2022. Each pergola will require 54 pounds of lumber and a metal kit (attachments and decorative embellishments.). The lumber used in these pergolas costs $1.50 per pound, and the metal kits cost $170 each. Each pergola will use two kinds of labor-2 hours of type | labor from people who run the cutting saws and finishing tools, and 3 hours of work from type II workers who attach the metal reinforcements and other hardware. The type employees are paid $15 per hour, and the type II are paid $12 per hour Manufacturing overhead is budgeted at $340,550 for the year 2022, broken down as follows. Variable costs Indirect materials $30,000 Manufacturing supplies 40,350 Maintenance and utilities 66,000 Total variable MOH: 136,350 Fixed costs Supervision 80,000 These are ANNUAL amounts Insurance 14,400 Depreciation 109,800 Total fixed MOH: 204,200 Total $340,550 During the first quarter, ended March 31, 2022, 1,050 units were actually produced with the following costs. Lumber $87,000 Metal kits 178,840 Type I labor 31,500 Type Il labor 39,060 Indirect materials 11,200 These are quarterly amounts Manufacturing supplies 14,150 Maintenance and utilities 22,500 Supervision 25,000 Insurance 3,600 Depreciation 27,450 Total $440,300 Required: 1. Prepare the annual manufacturing budget for 2022, assuming that 3,000 pergolas will be produced. Use the Excel template provided in the other attached file. 2. Peak sales occur during the summer months, so management expects production to be highest in the first quarter of the year. Prepare the flexible budget for manufacturing for the quarter ended March 31, 2022, assuming that production is a) 950 units, b) 1,050 units and c) 1,200 units. (Note: You have to prepare a separate budget for each level of activity. See sheet 2 on the Excel template). 3. Assuming that the pergola line is treated as a cost center, prepare a flexible budget report for manufacturing for the quarter ended March 31, 2022, when 1,050 units were produced. (Round all budgeted amounts to the nearest dollar.) 4. Prepare a brief report about how well management contained costs for the quarter. 5. The accounting manager reviewed the cost reports and noted the following actual costs for a particular order that consisted of 20 pergolas: *1,200 pounds of lumber were purchased at a total cost of $2,040. *Twenty (20) metal kits were assembled at a total cost of $3,240. *Type I employees worked 38 hours on this project at a total cost of $570. *Type II finishing employees worked 65 hours at a total cost of $796.25. The following are the standard costs that were developed for this project. Each finished item should have used: 1. 54 pounds of lumber at $1.50 per pound 2. 1 metal kit at $170 3. 2 hours of type I labor from people who run the oven and trim the plastic at a standard wage rate of $15 per hour 4. 3 hours of type II labor from people who attach the hatches and seat and other hardware at a standard wage rate of $12 per hour. Calculate the 1) price variance (AQ X AP) -(AQ X SP)) and 2) quantity variance ((AQ X SP)-(SQ X SP)) for each item and explain what could cause the variance for each item. a. Lumber b. Metal kits. C. Type I workers. d. Type II workers. Sundazzler Inc. Flexible Budget Report Quarter Ended March 21, 2022 950 units 1,050 units 1,200 units Costs: Variable costs Lumber Metal kits Labor-type I Labor-type II Indirect materials Manufacturing supplies Maintenance and utilities Total variable costs Fixed costs Supervision Insurance Depreciation Total fixed costs Total costs
Step by Step Solution
There are 3 Steps involved in it
Step: 1
Get Instant Access to Expert-Tailored Solutions
See step-by-step solutions with expert insights and AI powered tools for academic success
Step: 2
Step: 3
Ace Your Homework with AI
Get the answers you need in no time with our AI-driven, step-by-step assistance
Get Started