Question
SuperValue Distribution Center has 14 night-shift employees and 13 trucks to be loaded before 3:00 am. The time (number of minutes) required to load each
SuperValue Distribution Center has 14 night-shift employees and 13 trucks to be loaded before 3:00 am. The time (number of minutes) required to load each truck by employees is shown in Exam III Question 24 Data.xlsx.
SuperValue wants to minimize the total loading time needed to complete all loading jobs, given that
All trucks must be loaded
All employees must be assigned to at least one loading job
Truck #11 must be loaded by Employee #7
Employee #4 must not be loading Truck #4
Two employees must be loading Truck #13 assume that, for Truck #13, loading times are
already adjusted for a two-employee loading requirement
Truck #3 must be loaded by either Employee #5 or Employee #8
1) Given above information, what is the minimum total loading time needed to complete all loading jobs?
A) 412.33 minutes
B) 824.66 minutes
C) 1,175.89 minutes
D) 1,223.64 minutes
E) 1,260.04 minutes
F) 1,301.25 minutes
G) 1,364.52 minutes
H) Infeasible solution: cannot be solved, one or more of the requirements cannot be
satisfied.
Step by Step Solution
There are 3 Steps involved in it
Step: 1
Get Instant Access to Expert-Tailored Solutions
See step-by-step solutions with expert insights and AI powered tools for academic success
Step: 2
Step: 3
Ace Your Homework with AI
Get the answers you need in no time with our AI-driven, step-by-step assistance
Get Started