Question
Suppose a power system which operates three generators to serve its load (800 MW in total) Generators Cost Curve P max P min Unit 1
Suppose a power system which operates three generators to serve its load (800 MW in total)
Generators | Cost Curve | Pmax | Pmin |
Unit 1 | P1=101+7.5P1+0.025P12 | 300MW | 150MW |
Unit 2 | P2=31+11P2+0.05P22 | 300MW | 200MW |
Unit 3 | P3=78+2.0P3+0.05P32 | 400MW | 100MW |
1. What is the goal of economic dispatch? Formulate it mathematically. Explicitly represent the objective and constraints.
2. Why and under what situation does the economic dispatch model the decision making process of the generators in response to the price?
3. Neglect any operational limits of each generator and find the generation amount for each generator and Lagrange multiplier. What does Langrange multiplier indicate?
4. If he operating limits of the power system are binding, what would happen to the power system operation?
max
Step by Step Solution
There are 3 Steps involved in it
Step: 1
Financial dispatch is a basic part of force framework activity that plans to decide the ideal age levels for every generator to fulfil the heap need while limiting the complete age cost Here are the s...Get Instant Access to Expert-Tailored Solutions
See step-by-step solutions with expert insights and AI powered tools for academic success
Step: 2
Step: 3
Ace Your Homework with AI
Get the answers you need in no time with our AI-driven, step-by-step assistance
Get Started