Suppose you are a project manager at a construction site located in Durban. This construction project of road infrastructure was set to be completed in

Suppose you are a project manager at a construction site located in Durban. This construction project of road
infrastructure was set to be completed in December 2023 in time for the festive period. Against this context and the
backdrop of the construction mafia in South Africa, you are required to write a report on the following:
Format:
Section Mark Breakdown
Introduction (2 Marks)
Body (2 Marks)
Questions to be addressed:
1. Explain at least 3 different stakeholders that are
applicable to this project.
(6 Marks)
2 marks for application to a maximum of 6 marks
2. Examine how you would effectively engage with
stakeholders to communicate the challenges and
way forward.
(6 Marks)
3 marks for theory
3 marks for application per stage
3. Use the Thomas- Kilmann Conflict Mode
Instrument to outline how you as the project
manager can overcome the challenge of conflict
as arisen by the construction mafia. You are
required to provide an overview of each style
before providing a recommendation on the most
suited one.
(30 Marks)
2 marks for each relevant theory point to a maximum of
10 marks
4 marks for application per stage 20 marks
4. Use the 4 trends and emerging practices in project
communication management as a means of
maintaining effective relationships with the
stakeholders (hint: think back to the stakeholders
that were outlined earlier).
(24 Marks)
2 marks for each relevant theory point to a maximum of
8 marks
4 marks for application per stage 16 marks
5. Stakeholders can affect various aspects of a
project. Considering the stakeholders outlined,
examine ANY 4 of these aspects in relation to the
construction project
(28 Marks)
4 marks for each relevant theory point 8 marks
5 marks for application per process (x2 application points)
20 marks
Conclusion 2 marks
END OF PAPER

Step by Step Solution

There are 3 Steps involved in it

Step: 1

blur-text-image

Get Instant Access to Expert-Tailored Solutions

See step-by-step solutions with expert insights and AI powered tools for academic success

Step: 2

blur-text-image_2

Step: 3

blur-text-image_3

Ace Your Homework with AI

Get the answers you need in no time with our AI-driven, step-by-step assistance

Get Started

Recommended Textbook for

Project management the managerial process

Authors: Eric W Larson, Clifford F. Gray

5th edition

73403342, 978-0073403342

More Books

Students also viewed these General Management questions