Sweeten Company had no jobs in progress at the beginning of March and no beginning inventories. It started only two jobs during March-Job P and Job Q. Job P was completed and sold by the end of March and Job was incomplete at the end of March. The company uses a plantwide predetermined overhead rate based on direct labour hours. The following additional information is available for the company as a whole and for Jobs P and tall data and questions relate to the month of March Estimated total fixed manufacturing overhead Estimated variable manufacturing overhead per direct labour hour Estimated total direct labour-hours to be worked Total actual ufacturing overhead costs incurred $ 13,00 $1.00 . 15,500 Direct materials Direct labour Actual direct Labour-hours worked Job $ 16.000 535,300 2.200 Sub 9.100 5.100 550 8. Assume the ending raw materials inventory is $2.100 and the company does not use any indirect materials. Prepare a schedule of cost of goods manufactured (Do not leave any empty spaces input a wherever it is required) Ney no 8. Assume the ending raw materials inventory is $2100 and the company does not use any indirect materias Prepare a schedule of cost of goods manufactured (Do not leave any empty spaces: input a wherever it is required) Scheda Cortof Goods factured rits Direct materials spoed Total raw materials available 0 bo Riomaterials used in production 5 Total manufacturing costs $ 0 Cost of goods manufactured w Sweeten Company had no jobs in progress at the beginning of March and no beginning inventories. It started only two jobs during March-Job P and Job Q. Job P was completed and sold by the end of March and Job was incomplete at the end of March. The company uses a plantwide predetermined overhead rate based on direct labour hours. The following additional information is available for the company as a whole and for Jobs P and tall data and questions relate to the month of March Estimated total fixed manufacturing overhead Estimated variable manufacturing overhead per direct labour hour Estimated total direct labour-hours to be worked Total actual ufacturing overhead costs incurred $ 13,00 $1.00 . 15,500 Direct materials Direct labour Actual direct Labour-hours worked Job $ 16.000 535,300 2.200 Sub 9.100 5.100 550 8. Assume the ending raw materials inventory is $2.100 and the company does not use any indirect materials. Prepare a schedule of cost of goods manufactured (Do not leave any empty spaces input a wherever it is required) Ney no 8. Assume the ending raw materials inventory is $2100 and the company does not use any indirect materias Prepare a schedule of cost of goods manufactured (Do not leave any empty spaces: input a wherever it is required) Scheda Cortof Goods factured rits Direct materials spoed Total raw materials available 0 bo Riomaterials used in production 5 Total manufacturing costs $ 0 Cost of goods manufactured w