Answered step by step
Verified Expert Solution
Question
1 Approved Answer
Table Q2 depicts the list of industrial loads in a manufacturing factory. Demand estimation has to be made for these loads based on proper utilisation
Table Q2 depicts the list of industrial loads in a manufacturing factory. Demand estimation has to be made for these loads based on proper utilisation factor (ku) and diversity factor (ks). Three (3) levels of diversity factor needs to be assumed in this installation are distribution box (DB), plant distribution box (PDB) and main general distribution board (MGDB) before connecting to the distribution transformer. (i) Prepare the electrical block diagram for the installation by showing the utilisation of ku and ks. (ii) Analyse the estimated demand at each PDB. (iii) Decide the total estimated demand that is to be reached at the distribution transformer. Table Q2: List of Industrial Loads Table Q2 depicts the list of industrial loads in a manufacturing factory. Demand estimation has to be made for these loads based on proper utilisation factor (ku) and diversity factor (ks). Three (3) levels of diversity factor needs to be assumed in this installation are distribution box (DB), plant distribution box (PDB) and main general distribution board (MGDB) before connecting to the distribution transformer. (i) Prepare the electrical block diagram for the installation by showing the utilisation of ku and ks. (ii) Analyse the estimated demand at each PDB. (iii) Decide the total estimated demand that is to be reached at the distribution transformer. Table Q2: List of Industrial Loads
Step by Step Solution
There are 3 Steps involved in it
Step: 1
Get Instant Access to Expert-Tailored Solutions
See step-by-step solutions with expert insights and AI powered tools for academic success
Step: 2
Step: 3
Ace Your Homework with AI
Get the answers you need in no time with our AI-driven, step-by-step assistance
Get Started