Question
Task 2: The Concrete Masonry Corporation has designed and manufactured pre-stressed concrete for the building Industry for years; the company enjoyed a stable marketplace and
Task 2:
The Concrete Masonry Corporation has designed and manufactured pre-stressed concrete for the building Industry for years; the company enjoyed a stable marketplace and a relatively predictable business environment. Although there had been a boom in residential construction recently, commercial work was on the decline. As a result, all the pre-stressed concrete manufacturers were going further afield to big jobs. To survive, Concrete Masonry Corporation was forced to bid on jobs previously thought to be out of their geographical area. Therefore, survival depended upon staying competitive. However, with the declining conditions of the market and the evolution that had drastically changed the character of the marketplace, the Concrete Masonry Corporation's previously successful approach was now in question. With the removal of trade barriers and other Globalised international trade agreements, the Concrete Masonry Corporation competed with other pre-stressed manufacturers headquartered worldwide. A decision was then made to transfer several manufacturing machines to a new site in Eastern Europe to allow more agility and efficiency within their manufacturing supply.
The Project
The Project included transferring eight pre-stressed concrete assembly machines and ancillary equipment into Eastern Europe. Scheduling the Project had to take six months from September before production must start to supply potential customers. A site had been selected, although the appointed Project Manager and potential team members had not visited the area, nor did they understand the weather conditions of wind, rain and snow that prevailed in it. The assembly machines were to be transported by sea and then by road haulage before arriving at the new site. Road infrastructure was again an area that required attention.
Kevin Lewis
Kevin Lewis has been appointed as the Project manager for this installation transfer. He is a The 29-year-old graduate of a well-known University in the UK with a BS degree in Mechanical Engineering. After graduation, he worked for five years in Engineering Design Industries. Although he took a significant pay cut, he jumped at the opportunity to return to his home location with Concrete Masonry Corporation. His job in Engineering Industries had been very demanding. In addition, the long hours and extensive travelling had created tension in his marriage. He was looking forward to a normal job with reasonable hours, or so he thought. While working in Engineering Design Industries, Lewis worked on projects and installed new Engineering designs. He was confident that he had the requisite technical expertise to excel at his new job with the Concrete Masonry Corporation.
The Team
Lewis had a part-time team of five assistants on placement from the departments within Concrete Masonry Corporation. At first, he was not sure how freely he could delegate work to the assistants bearing in mind they also reported to other managers within the organisation. However, he quickly realised they were all very bright, competent workers who were anxious to leverage this project experience into a lucrative career. The project transfer has an investment of 900,000 and is scheduled to take six months to complete, considering that the Project would be completed during the winter, which would be difficult. However, Lewis and his team would first need to visit the new location and consider the project activities.
Kevin Lewis is only Project managing equipment transfer, not the actual facility building project. (Assume the building has already been completed.)
Remember to provide a Network diagram, Gantt chart, cost appraisal methods and any other relevant table or information as an Appendix; also, any practical examples concerning pertinent theories of Task 2 should be derived from the case study.
Using the above case study
1.Prepare Work Breakdown Structure (with brief details of work packages) for this transfer project that covers six months from September 2023.
2.Use the Work Breakdown Structure in question one above to prepare Gantt Chart for this project.
3.Prepare Cost Estimation (with a time-phased budget) ensuring that it can operate on time and within budget.(project transfer has an investment of 900,000 and time period of this project is 6 months from September 2023)
Step by Step Solution
There are 3 Steps involved in it
Step: 1
Get Instant Access to Expert-Tailored Solutions
See step-by-step solutions with expert insights and AI powered tools for academic success
Step: 2
Step: 3
Ace Your Homework with AI
Get the answers you need in no time with our AI-driven, step-by-step assistance
Get Started