Answered step by step
Verified Expert Solution
Question
1 Approved Answer
Task 3: Rachel co. acquired an old 5-story building of 500,000 at cost and renovated it into a modern office building. Renovation costs and
Task 3: Rachel co. acquired an old 5-story building of 500,000 at cost and renovated it into a modern office building. Renovation costs and other details are as follows: - Renovation costs (i.e. repainting, floor replacing, windows/doors remodeling, ...): 20,000 - An elevator installed for the first time: 40,000 - New modern air condition system: 15,000. The office building was ready for intended use at 01 January 20X7 which being depreciated over 25 years by straight line basis. The elevator has 10 years of estimated life and that of air condition system is 20,000 operating hours. No residual values are attributed to any of the component parts. There were several events as following: (i) In 20X9, Rachel started to extend a new floor at the top of the building for meeting rooms. Total extension cost was 22,000. This project was finished in 31 December 20X9. (ii) At 01 September 20Y0, the AC system was partly damaged due to a fire accident and was repaired at a cost of 5,000. However, its remaining estimated life was shortened to 4,000 hours. Ghi ch: Cn b coi thi khng gii thch g thm Records about AC operating hours: -Accumulated operating hours to 31 August 20Y0: 12,000 hours - Operating hours from 01 January to 31 August 20Y0: 2,000 hours - Operating hours from 01 September to 31 December 20Y0: 250 hours. (iii) Annual maintenance cost for elevator incurred in 20Y0: 2,000.
Step by Step Solution
There are 3 Steps involved in it
Step: 1
Get Instant Access to Expert-Tailored Solutions
See step-by-step solutions with expert insights and AI powered tools for academic success
Step: 2
Step: 3
Ace Your Homework with AI
Get the answers you need in no time with our AI-driven, step-by-step assistance
Get Started