Task WBS Task Name Cost Mode 0 0 Fabrication of Food Truck for Niharika Kitchens $125,741.00 1 Planning $16,980.00 N 1.1 Requirements $3,920.00 W 1.1.1

image text in transcribedimage text in transcribedimage text in transcribedimage text in transcribedimage text in transcribedimage text in transcribed
Task WBS Task Name Cost Mode 0 0 Fabrication of Food Truck for Niharika Kitchens $125,741.00 1 Planning $16,980.00 N 1.1 Requirements $3,920.00 W 1.1.1 Selecting model and variant of Truck $420.00 4 1.1.2 Finalizing kitchen Items to be included $420.00 1.1.3 Preparing list of functions required in truck $1,700.00 6 1.1.4 Finalizing the list $260.00 7 1.1.5 Selecting Equipments $600.00 8 1.1.6 Finalizing equipment variants and models $520.00 9 1.2 Designing $7,500.00 10 1.2.1 Initial Design $600.00 11 1.2.2 Identifying list of drawings $600.00 12 1.2.3 Interior Designing $1,200.00 13 1.2.4 CAD Analysis $1,460.00 14 1.2.5 Design iterations $2,120.00 15 1.2.6 Release of Drawings $1,000.00 16 1.2.7 Getting Drawings Approved $520.00 17 1.3 Regulations $5,560.00 18 1.3.1 Checking What Permits Are Required $200.00 19 1.3.2 Obtaining Permits $2,000.00 20 1.3.3 Checking Proximity Restrictions $1,280.00 21 1.3.4 Checking Emission Guidelines $2,080.005 2 4 Procurement $68,632.00 5 2.1 I Bought Out Material $54,212.00 5 2.1.1 Buying The Truck Decided $51,000.00 % 2.1.2 Buying Electrical Equipments $1,050.00 5 2.1.3 Buying Propane Tanks $1,586.00 5 2.1.4 Buying other material $576.00 5 2.2 1 Fabrication Material $14,420.00 5 2.2.1 Procuring stainless steel material $4,400.00 m 5 2.2.2 Procuring Wooden Material $5,860.00 5 2.2.3 Procuring Paint and Finish Products $3,272.00 5 2.2.4 Buying Miscellaneous items $888.00 5 3 1 Fabrication $30,120.00 5 3.1 1 Exterior Work $11,680.00 E 5 3.1.1 Remodeling the body for serving window $6,600.00 E 5 3.1.2 Installing windows $1,080.00 5 3.1.3 Creating Emeregency Exits $4,000.00 5 3.2 1 Interior Work $13,352.00 E 3.2.1 Building counter space $4,080.00 m 5 3.2.2 Flooring $2,000.00 5 3.2.3 Preparing storage area $4,032.00 5 3.2.4 Electrification $3,240.00 5 3.3 1 Finishing Work $5,088.00 m 5 3.3.1 Painting Interior of theTruck $1,440.00 m 5 3.3.2 Painting Exterior of the Truck $2,160.00 m 5 3.3.3 Installing Electrical Equipments $800.00 5 3.3.4 Branding The Truck $688.00 48 4 Testing $9,169.00 49 4.1 Inspecting If All Equipments Are Working As Per Guidelines $1,929.00 50 4.2 Customer Review for final feedback $1,920.00 51 4.3 Doing final touch as per customr feedback $5,320.00 52 5 Launch $840.00 53 5.1 Driving The Truck Till The Designated Place $160.00 54 5.2 Setting Up The Truck (Kitchen, Windows) $160.00 55 5.3 Launch Event $520.00Task WBS Task Name Duration Start Finish Mode 0 0 Fabrication of Food Truck for Niha 192 days Mon 22-06-06 8:00 AM Tue 23-02-28 5:00 PM 1 1 Planning 53 days Mon 22-06-06 8:00 AM Wed 22-08-17 5:00 PM 2 1.1 Requirements 19 days Mon 22-06-06 8:00 AM Thu 22-06-30 5:00 PM 3 1.1.1 Selecting model and variant of 2 days Mon 22-06-06 8:00 AM Tue 22-06-07 5:00 PM 4 1.1.2 Finalizing kitchen Items to be i 2 days Wed 22-06-08 8:00 AM Thu 22-06-09 5:00 PM 5 1.1.3 Preparing list of functions requi 10 days Fri 22-06-10 8:00 AM Thu 22-06-23 5:00 PM 6 1.1.4 Finalizing the list 1 day Fri 22-06-24 8:00 AM Fri 22-06-24 5:00 PM 7 1.1.5 Selecting Equipments 3 days Mon 22-06-27 8:00 AM Wed 22-06-29 5:00 PM 8 1.1.6 Finalizing equipment variants a 1 day Thu 22-06-30 8:00 AM Thu 22-06-30 5:00 PM 9 1.2 Designing 19 days Fri 22-07-01 8:00 AM Wed 22-07-27 5:00 PM 10 1.2.1 Initial Design 2 days Fri 22-07-01 8:00 AM Mon 22-07-04 5:00 PM 11 1.2.2 Identifying list of drawings 2 days Tue 22-07-05 8:00 AM Wed 22-07-06 5:00 PM 12 1.2.3 Interior Designing 5 days Thu 22-07-07 8:00 AM Wed 22-07-13 5:00 PM 13 1.2.4 CAD Analysis 4 days Thu 22-07-14 8:00 AM Tue 22-07-19 5:00 PM 14 1.2.5 Design iterations 3 days Wed 22-07-20 8:00 AM Fri 22-07-22 5:00 PM 15 1.2.6 Release of Drawings 2 days Mon 22-07-25 8:00 AM Tue 22-07-26 5:00 PM 16 1.2.7 Getting Drawings Approved 1 day Wed 22-07-27 8:00 AM Wed 22-07-27 5:00 PM 17 1.3 Regulations 15 days Thu 22-07-28 8:00 AM Wed 22-08-17 5:00 PM 18 1.3.1 Checking What Permits Are Re 1 day Thu 22-07-28 8:00 AM Thu 22-07-28 5:00 PM 19 1.3.2 Obtaining Permits 10 days Fri 22-07-29 8:00 AM Thu 22-08-11 5:00 PM 20 1.3.3 Checking Proximity Restrictions 4 days Fri 22-07-29 8:00 AM Wed 22-08-03 5:00 PM 21 1.3.4 Checking Emission Guidelines 4 days Fri 22-08-12 8:00 AM Wed 22-08-17 5:00 PM22 2 Procurement 12 days Thu 22-08-18 8:00 AM Fri 22-09-02 5:00 PM 23 2.1 Bought Out Material 5 days Thu 22-08-18 8:00 AM Wed 22-08-24 5:00 PM 24 2.1.1 Buying The Truck Decided 5 days Thu 22-08-18 8:00 AM Wed 22-08-24 5:00 PM 25 2.1.2 Buying Electrical Equipments 4 days Thu 22-08-18 8:00 AM Tue 22-08-23 5:00 PM 26 2.1.3 Buying Propane Tanks 4 days Thu 22-08-18 8:00 AM Tue 22-08-23 5:00 PM 27 2.1.4 Buying other material 1 day Wed 22-08-24 8:00 AM Wed 22-08-24 5:00 PM 28 2.2 Fabrication Material 12 days Thu 22-08-18 8:00 AM Fri 22-09-02 5:00 PM 29 2.2.1 Procuring stainless steel materi 7 days Thu 22-08-18 8:00 AM Fri 22-08-26 5:00 PM 30 2.2.2 Procuring Wooden Material 7 days Thu 22-08-18 8:00 AM Fri 22-08-26 5:00 PM 31 2.2.3 Procuring Paint and Finish Prod 8 days Thu 22-08-18 8:00 AM Mon 22-08-29 5:00 PM 32 2.2.4 Buying Miscellaneous items 4 days Tue 22-08-30 8:00 AM Fri 22-09-02 5:00 PM 33 3 Fabrication 110 days Mon 22-09-05 8:00 AM Fri 23-02-03 5:00 PM 34 3.1 Exterior Work 30 days Mon 22-09-05 8:00 AM Fri 22-10-14 5:00 PM 35 3.1.1 Remodeling the body for servin 15 days Mon 22-09-05 8:00 AM Fri 22-09-23 5:00 PM 36 3.1.2 Installing windows 5 days Mon 22-09-26 8:00 AM Fri 22-09-30 5:00 PM 37 3.1.3 Creating Emeregency Exits 10 days Mon 22-10-03 8:00 AM Fri 22-10-14 5:00 PM 38 3.2 Interior Work 48 days Mon 22-10-17 8:00 AM Wed 22-12-21 5:00 PM 39 3.2.1 Building counter space 17 days Mon 22-10-17 8:00 AM Tue 22-11-08 5:00 PM 40 3.2.2 Flooring 10 days Wed 22-11-09 8:00 AM Tue 22-11-22 5:00 PM 41 3.2.3 Preparing storage area 12 days Wed 22-11-23 8:00 AM Thu 22-12-08 5:00 PM 42 3.2.4 Electrification 9 days Fri 22-12-09 8:00 AM Wed 22-12-21 5:00 PM 43 3.3 Finishing Work 32 days Thu 22-12-22 8:00 AM Fri 23-02-03 5:00 PM 44 3.3.1 Painting Interior of theTruck 10 days Thu 22-12-22 8:00 AM Wed 23-01-04 5:00 PM 45 3.3.2 Painting Exterior of the Truck 15 days Thu 23-01-05 8:00 AM Wed 23-01-25 5:00 PM 46 3.3.3 Installing Electrical Equipments 5 days Thu 23-01-26 8:00 AM Wed 23-02-01 5:00 PM 47 3.3.4 Branding The Truck 2 days Thu 23-02-02 8:00 AM Fri 23-02-03 5:00 PM48 4 Testing 14 days Mon 23-02-06 8:00 AM Thu 23-02-23 5:00 PM 49 4.1 Inspecting If All Equipments Are 6 days Mon 23-02-06 8:00 AM Mon 23-02-13 5:00 PM 50 4.2 Customer Review for final feedba 3 days Tue 23-02-14 8:00 AM Thu 23-02-16 5:00 PM 51 4.3 Doing final touch as per customr 5 days Fri 23-02-17 8:00 AM Thu 23-02-23 5:00 PM 52 5 Launch 3 days Fri 23-02-24 8:00 AM Tue 23-02-28 5:00 PM 53 5.1 Driving The Truck Till The Design 1 day Fri 23-02-24 8:00 AM Fri 23-02-24 5:00 PM 54 5.2 Setting Up The Truck (Kitchen, Wi 1 day Mon 23-02-27 8:00 AM Mon 23-02-27 5:00 PM 55 5.3 Launch Event 1 day Tue 23-02-28 8:00 AM Tue 23-02-28 5:00 PM

Step by Step Solution

There are 3 Steps involved in it

Step: 1

blur-text-image

Get Instant Access with AI-Powered Solutions

See step-by-step solutions with expert insights and AI powered tools for academic success

Step: 2

blur-text-image

Step: 3

blur-text-image

Ace Your Homework with AI

Get the answers you need in no time with our AI-driven, step-by-step assistance

Get Started

Recommended Textbook for

Introduction To Corporate Finance

Authors: Laurence Booth, Sean Cleary

3rd Edition

978-1118300763, 1118300769

Students also viewed these General Management questions