Answered step by step
Verified Expert Solution
Link Copied!

Question

1 Approved Answer

TASKS 1. Considered the following table. All estimated duration times are in days, and the network proceeds from Node 1 to Node 7: Activity |

image text in transcribed
image text in transcribed
TASKS 1. Considered the following table. All estimated duration times are in days, and the network proceeds from Node 1 to Node 7: Activity | Initial Node | Final Node | Estimated Duration A 1 2 2 B 3 2 C 3 D 2 5 4 E 2 3 2 F 5 5 G 6 3 H 5 6 6 5 7 3 6 7 2 a) Draw an AOA network diagram representing the project. Put the node numbers in circles and draw arrows from node to node, labeling each arrow with the activity letter and estimated time. b) Identify ALL of the paths on the network diagram and note how long they are. (Use Figure 6.8 in textbook as a guide for how to represent each path). c) What is the critical path for this project and how long is it? d) What is the shortest possible time needed to complete this project

Step by Step Solution

There are 3 Steps involved in it

Step: 1

blur-text-image

Get Instant Access to Expert-Tailored Solutions

See step-by-step solutions with expert insights and AI powered tools for academic success

Step: 2

blur-text-image

Step: 3

blur-text-image

Ace Your Homework with AI

Get the answers you need in no time with our AI-driven, step-by-step assistance

Get Started

Recommended Textbook for

Tourism Concepts And Practices

Authors: John R Walker, Josielyn T Walker

1st Edition

0138142459, 9780138142452

More Books

Students also viewed these General Management questions