Answered step by step
Verified Expert Solution
Link Copied!

Question

1 Approved Answer

Taveras Corporation is currently operating at 50% of its available manufacturing capacity. It uses a job-order costing system with a plantwide predetermined overhead rate based

Taveras Corporation is currently operating at 50% of its available manufacturing capacity. It uses a job-order costing system with a plantwide predetermined overhead rate based on machine-hours. At the beginning of the year, the company made the following estimates:

Machine-hours required to support estimated production 250,000
Fixed manufacturing overhead cost $ 6,000,000
Variable manufacturing overhead cost per machine-hour $ 2.00

Required:

1. Compute the plantwide predetermined overhead rate.

2. During the year, Job P90 was started, completed, and sold to the customer for $4,200. The following information was available with respect to this job:

Direct materials $ 1,932
Direct labor cost $ 1,386
Machine-hours used 89

Compute the total manufacturing cost assigned to Job P90.

image text in transcribedimage text in transcribed

Wilmington Company has two manufacturing departmentsAssembly and Fabrication. It considers all of its manufacturing overhead costs to be fixed costs. The first set of data that is shown below is based on estimates from the beginning of the year. The second set of data relates to one particular job completed during the yearJob Bravo.

Estimated Data Assembly Fabrication Total
Manufacturing overhead costs $ 4,370,000 $ 4,830,000 $ 9,200,000
Direct labor-hours 115,000 69,000 184,000
Machine-hours 46,000 230,000 276,000

Job Bravo Assembly Fabrication Total
Direct labor-hours 24 16 40
Machine-hours 16 19 35

Required:

1. If Wilmington used a plantwide predetermined overhead rate based on direct labor-hours, how much manufacturing overhead would be applied to Job Bravo?

2. If Wilmington uses departmental predetermined overhead rates with direct labor-hours as the allocation base in Assembly and machine-hours as the allocation base in Fabrication, how much manufacturing overhead would be applied to Job Bravo?

(Round your intermediate calculations to 2 decimal places.)

image text in transcribed

Complete this question by entering your answers in the tabs below. Required 1 Required 2 Compute the plantwide predetermined overhead rate. Predetermined overhead rate per MH Complete this question by entering your answers in the tabs below. Required 1 Required 2 During the year, Job P90 was started, completed and sold to the customer for $4,200. Compute the total manufacturing cost assigned to Job P90. Direct materials Direct labor Overhead applied Total manufacturing cost 1. Plantwide manufacturing overhead applied to Job Bravo 2. Manufacturing overhead applied from Assembly to Job Bravo Manufacturing overhead applied from Fabrication to Job Bravo Total departmental manufacturing overhead applied to Job Bravo

Step by Step Solution

There are 3 Steps involved in it

Step: 1

blur-text-image

Get Instant Access to Expert-Tailored Solutions

See step-by-step solutions with expert insights and AI powered tools for academic success

Step: 2

blur-text-image

Step: 3

blur-text-image

Ace Your Homework with AI

Get the answers you need in no time with our AI-driven, step-by-step assistance

Get Started

Recommended Textbook for

Case Study In Auditing

Authors: Donald H Taylor

1st Edition

0471046264, 978-0471046264

More Books

Students also viewed these Accounting questions

Question

4-6 Is there a digital divide? If so, why does it matter?

Answered: 1 week ago