Question
Taveras Corporation is currently operating at 50% of its available manufacturing capacity. It uses a job-order costing system with a plantwide predetermined overhead rate based
Taveras Corporation is currently operating at 50% of its available manufacturing capacity. It uses a job-order costing system with a plantwide predetermined overhead rate based on machine-hours. At the beginning of the year, the company made the following estimates:
Machine-hours required to support estimated production 225,000 Fixed manufacturing overhead cost $ 4,275,000 Variable manufacturing overhead cost per machine-hour $ 2.00
Required:
1. Compute the plantwide predetermined overhead rate.
2. During the year, Job P90 was started, completed, and sold to the customer for $3,700. The following information was available with respect to this job:
Direct materials $ 1,702 Direct labor cost $ 1,221 Machine-hours used 84
Compute the total manufacturing cost assigned to Job P90.
Step by Step Solution
There are 3 Steps involved in it
Step: 1
Get Instant Access to Expert-Tailored Solutions
See step-by-step solutions with expert insights and AI powered tools for academic success
Step: 2
Step: 3
Ace Your Homework with AI
Get the answers you need in no time with our AI-driven, step-by-step assistance
Get Started