Textile Mill Scheduling The Scottsville Textile Mill produces five different fabrics. Each fabric can be woven on one or more of the mills 38 looms.

Textile Mill Scheduling

The Scottsville Textile Mill produces five different fabrics. Each fabric can be woven on one or more of the mills 38 looms. The sales departments forecast of demand for the next month is shown in Table 1, along with data on the selling price per yard, variable cost per yard, and purchase price per yard. The mill operates 24 hours a day and is scheduled for 30 days during the coming month.

Table 1

Monthly Demand, Selling Price, Variable Cost, and Purchase Price Data for Scottsville Textile Mill Fabrics

Fabric

Demand (yards)

Selling price ($/yard)

Variable Cost ($/yard)

Purchase Price ($/yard)

1

16,500

0.99

0.66

0.80

2

22,000

0.86

0.55

0.70

3

62,000

1.10

0.49

0.60

4

7,500

1.24

0.51

0.70

5

62,000

0.70

0.50

0.70

The mill has two types of looms: dobby and regular. The dobbie looms are more versatile and can be used for all five fabrics. The regular looms can produce only three of the fabrics. The mill has a total of 38 looms: 8 are dobby and 30 are regular. The rate of production for each fabric on each type of loom is given in Table 2. The time required to change over from producing one fabric to another is negligible and does not have to be considered.

Table 2

Loom Production Rates for the Scottsville Textile Mill

Loom Rate (yards/hour)

Fabric

Dobby

Regular

1

4.63

2

4.63

3

5.23

5.23

4

5.23

5.23

5

4.17

4.17

Note: Fabrics 1 and 2 can be manufactured only on the dobbie loom.

The Scottsville Textile Mill satisfies all demand with either its own fabric or fabric purchased from another mill. Fabrics that cannot be woven at the Scottsville Mill because of limited loom capacity will be purchased from another mill. The purchase price of each fabric is also shown in Table 1.

Develop a model that can be used to schedule production for the Scottsville Textile Mill, and at the same time, determine how many yards of each fabric must be purchased from another mill. Include a discussion and analysis of the following items in your report:

  1. A discussion of the value of additional loom time. (The mill is considering purchasing a ninth dobbie loom. What is your estimate of the monthly profit contribution of this additional loom?)
  2. A discussion of the objective coefficients ranges.
  3. A discussion of how the objective of minimizing total costs would provide a different model than the objective of maximizing total profit contribution. (How would the interpretation of the objective coefficients ranges differ for these two models?)

Step by Step Solution

There are 3 Steps involved in it

Step: 1

blur-text-image

Get Instant Access to Expert-Tailored Solutions

See step-by-step solutions with expert insights and AI powered tools for academic success

Step: 2

blur-text-image_2

Step: 3

blur-text-image_3

Ace Your Homework with AI

Get the answers you need in no time with our AI-driven, step-by-step assistance

Get Started

Recommended Textbook for

Audit Studies Behind The Scenes With Theory Method And Nuance

Authors: S. Michael Gaddis

1st Edition

3030100200, 978-3030100209

More Books

Students also viewed these Accounting questions