Answered step by step
Verified Expert Solution
Question
1 Approved Answer
Thank you!!! A new highway is to be constructed. Design A calls for a concrete pavement costing $90 per foot with a 20-year life, two
Thank you!!!
A new highway is to be constructed. Design A calls for a concrete pavement costing $90 per foot with a 20-year life, two paved ditches costing $3 per foot each; and three box culverts every mile, each costing 9,000 and having a 20-year life. Annual maintenance will cost $1, 800 per mile; the culvers must be cleaned every five years at a cost of $450 each per mile. Design B call for a bituminous pavement costing $45 per foot with a 10-year life; two sodded ditches costing $1.50 per foot each; and three pipe culverts every mile, each costing $2, 250 and having a 10-year life. The replacement culverts will cost $2, 400 each. Annual maintenance will cost $2, 700 per mile; the culverts must be cleaned yearly at a cost of $225 each per mile; and the annual ditch maintenance will cost $1.50 per foot per ditch. Compare the two designs on the basis of equivalent worth per mile for a 20-year period. Find the most economical design on the basis of Present Worth and Annual Worth methods using an MARR of 6 per year. For this problem, Develop the cash flow table for each design. Set up the flow equations but do not perform the numerical computations Step by Step Solution
There are 3 Steps involved in it
Step: 1
Get Instant Access to Expert-Tailored Solutions
See step-by-step solutions with expert insights and AI powered tools for academic success
Step: 2
Step: 3
Ace Your Homework with AI
Get the answers you need in no time with our AI-driven, step-by-step assistance
Get Started