Answered step by step
Verified Expert Solution
Link Copied!

Question

1 Approved Answer

Thank you i will give an outstanding review! {The foiioudng infomaon applies to the questions displayed beiow] Trico Company set the following standard unit costs

Thank you i will give an outstanding review!

image text in transcribedimage text in transcribedimage text in transcribedimage text in transcribed
{The foiioudng infomaon applies to the questions displayed beiow] Trico Company set the following standard unit costs for its single product. Direct materials [36 lbs. E $5.16 per 1b.} $153.66 Direct labor {6 hrs. @ $15 per hr.) 66.66 Factory overheadVariable {6 hrs. @ $2 per hr.} 42.66 Factory overheadFixed [6 hrs. @ $11 per hr.] 66.66 Total standard cost $351.66 The predetermined overhead rate is based on a planned operating volume of 80% of the productive capacity of 56,060 units per quarter. The following exible budget information is available. 6pc rating Levels 2695 5696 96% Production in units 39,266 44,866 56,466 Standard direct labor hours 235,266 268,866 362,466 Budgeted overhead Fixed factory overhead $2,956,666 $2,956,866 $2,956,866 Variable factory overhead $1,646,466 $1,681,666 $2,116,866 During the current quarter. the company operated at 9096 of capach and produced 50,400 units of prod uct; actual direct labor totaled 299,400 hours. Units produced were assigned the following standard costs. Direct materials [1,512,666 Ibs. @ $5.16 per Ib.) $ 2,211,266 Direct labor {362,466 hrs. @ $15 per hr.) 4,536,666 Factory overhead [362,466 hrs. 6 $18 per hr.) 5,443,266 Total standard cost $12,696,466 Actual costs incurred during the current quarter follow. Direct materials [1,499,666 Ibs. @ $6.36 per lb.) $ 9,443,266 Direct labor {299,466 hrs. @ $12.56 per hr.) 3,242,566 Fixed factory overhead costs 2,664,266 Variable factory overhead costs 2,438,566 Total actual costs $18,226,466 Required A Required B Required C Compute the variable overhead spending and efficiency variances. (Round "cost per unit" and "rate per hour" answers to 2 decimal places.) Actual Variable OH Cost Flexible Budget Standard Cost (VOH applied) $ O Required A Required B Required C Compute the fixed overhead spending and volume variances. (Round "cost per unit" and "rate per hour" answers to 2 decimal places.) Actual Fixed OH Cost Budgeted Overhead Standard Cost (FOH applied) O Required A Required B Required C Compute the total overhead controllable variance. Overhead Controllable Variance Total overhead controllable variance Required B Requ

Step by Step Solution

There are 3 Steps involved in it

Step: 1

blur-text-image

Get Instant Access to Expert-Tailored Solutions

See step-by-step solutions with expert insights and AI powered tools for academic success

Step: 2

blur-text-image_2

Step: 3

blur-text-image_3

Ace Your Homework with AI

Get the answers you need in no time with our AI-driven, step-by-step assistance

Get Started

Recommended Textbook for

Practical Pension Scheme Accounting

Authors: Shona Harvie, Joanne Scriven, Phil Spary

2nd Edition

1526508974, 9781526508973

More Books

Students also viewed these Accounting questions

Question

Describe the new structures for the HRM function. page 724

Answered: 1 week ago