Answered step by step
Verified Expert Solution
Link Copied!

Question

1 Approved Answer

The attached drawings show the plan and elevations PROPOSED PICNIC SHELTER. There are FOUR drawings in total: PS-01 to PS-04. This assignment allows you to

image text in transcribedimage text in transcribedimage text in transcribedimage text in transcribedimage text in transcribedimage text in transcribed

The attached drawings show the plan and elevations "PROPOSED PICNIC SHELTER". There are FOUR drawings in total: PS-01 to PS-04. This assignment allows you to demonstrate your understanding of the ANZSMM rules and measurement conventions and apply them to the measurement of areas and volumes. Task description: Prepare hand-written paper take-off for the following three trade sections (ONLY): - IN SITU CONCRETE - FORMWORK - REINFORCEMENT - Measure strictly in accordance with the relevant sections of the Australian and New Zealand Standard Method of Measurement of Building Works - 2018 edition (ANZSMM) and the specification notes provided. Check in the ANZSMM and be sure you measure only those items that should be included - but make sure you measure all relevant items for that trade section, with the exceptions noted below. - Ensure that waste calculations are correctly located and annotated. Show all waste calculations and make it clear how you arrived at any calculated dimensions included in the take-off. Where appropriate, provide sketches that show how you have derived dimensions. - Your calculations should support your answers and set out with each set of dimensions clearly identified. - Use figured dimensions wherever possible. Dimensions not shown on the drawings should be calculated as waste calculations. - Do not scale from the drawings unless you are certain that the dimensions cannot be calculated. Scaled dimensions are to be noted as such. - Use take-off paper for your calculations. Your takeoff is to be hand-written, in pen (not pencil). - DO NOT measure other trades such as Groundworks, Applied Finishes and Masonry - DO NOT include Preamble Items. Specification Notes: To be read in conjunction with "PROPOSED PICNIC SHELTER" Drawings PS-01 to PS-04: - 25MPa reinforced concrete to strip footings - 32 MPa reinforced concrete to ground slab - Concrete slabs on ground to receive a steel trowelled integral finish - Class 3 Formwork to edge of slab, class 5 formwork to face of steps. - Concrete cover to reinforcing 40mm generally, and as shown on the drawings - All exposed concrete blockwork faces are to receive a 6mm thick cement render coat (1:3) with wood float finish. - N120.887kg/m PROPOSED PICNIC SHELTER Drawing No PS-01 Scale AS SHOWN PROPOSED PICNIC SHELTER Drawing No PS-02 Scale 1:100 STEP IN FOOTING DETAIL 1:20 u)

Step by Step Solution

There are 3 Steps involved in it

Step: 1

blur-text-image

Get Instant Access to Expert-Tailored Solutions

See step-by-step solutions with expert insights and AI powered tools for academic success

Step: 2

blur-text-image

Step: 3

blur-text-image

Ace Your Homework with AI

Get the answers you need in no time with our AI-driven, step-by-step assistance

Get Started

Recommended Textbook for

Machine Learning And Knowledge Discovery In Databases European Conference Ecml Pkdd 2019 Wurzburg Germany September 16 20 2019 Proceedings Part 2 Lnai 11907

Authors: Ulf Brefeld ,Elisa Fromont ,Andreas Hotho ,Arno Knobbe ,Marloes Maathuis ,Celine Robardet

1st Edition

3030461467, 978-3030461461

More Books

Students also viewed these Databases questions