The blue curve (labeled "") depicts the NPV for a project with larger cash flows later of -51.000, 5100, $300, $400 and $875. The red curve (labeled 's") depicts the NPV for project with larger cash flows sooner of $1,000 $500 $400, $300, and $100. Drag on the graph either left or right to change the cost of capital interest rate at which the NPV is evaluated for the two projects Project S: NPV = CF. + SME = $1.000 + (1+0.1000) + 5400 5300 + 5100 (140.1000) (1+0.1000) (10.1000" $78.82 - $100 $300 = $1,000+ + + S-400 (1) (1+0.1000) (1+0.1000(0,1000) 5675 (1+0.10007 S100.40 NPV (S) 500 400 00 200 10040100 5 NPV ($) 500 400 300 OD 200 100 4100 78 82 0 20 5 10 -100- 10 Cost of Capital (%) 1. What is the approximate cost of capital for which the two cash flows are about equal? 3. 1096 b. 12% C. 13.5% d. 14.5% Select 2. What is the approximate internal rate of return (IRR) for the Project L cash flow? a. 1096 b. 12% C. 13.5% d. 14.5% Select 3. What is the approximate internal rate of return (IRR) for the Project S cash flow? a 10% b. 12% c. 13.59 d. 14.5% lect 4. What is the name for the point at which the two projects NPVs are equal? a. Inflection point b. Equal NPV rate c. Crossover rate d. There is no special name for this point 5. At a cost of capital less than the point at which they cross, which project will have the higher NPV? a. Projects b. Project c. Projects and will have the same NPV d. Cannot determine 6. At a cost of capital greater than the point at which they cross, which project will have the higher NPV? a. Projects b. Project c. Project S and I will have the same NPV d. Cannot determine Select 7. The internal rate of return (IRR) is the point at which a project's NPV equals 0. If the cost of capital were 5% (move the slider so that is the case), then a. Project Sis the better project because it has the higher IRR. b. Project Lis the better project because it has the higher NPV. c. It depends because there is a conflict between IRR and NPV. 8. If the cost of capital was greater than the point at which the two projected NPVs are equal, then 3. It depends because there is a conflict between IRR and NPV. t. There is no conflict because Projects has both a higher NPV and a higher IRR than Project L c. There is no conflict because Project L has both a higher NPV and a higher IRR than Project S