Answered step by step
Verified Expert Solution
Question
1 Approved Answer
The Camino Real Landfill was required to install a plastic liner to prevent leachate from migrating into the groundwater. The fill area was 43,000 m2
The Camino Real Landfill was required to install a plastic liner to prevent leachate from migrating into the groundwater. The fill area was 43,000 m2 and the installed liner cost was $8 per m2. In order to recover the investment, the owner charges to unload at the rates of $13 per pickup, $25 per dump truck, and $10 per compactor truck load. The fill area is adequate for 7 years. If the annual traffic is estimated to be 2500 pickup loads, 650 dump truck loads, and 1200 compactor-truck loads, what rate of return will the landfill owner make on the investment? The rate of return that will be made by the landfill owner is 19.3916 % per year
Step by Step Solution
There are 3 Steps involved in it
Step: 1
Get Instant Access to Expert-Tailored Solutions
See step-by-step solutions with expert insights and AI powered tools for academic success
Step: 2
Step: 3
Ace Your Homework with AI
Get the answers you need in no time with our AI-driven, step-by-step assistance
Get Started