Answered step by step
Verified Expert Solution
Link Copied!

Question

1 Approved Answer

The canton of Zurich plans a wildlife bridge with a timber structure. As such structures have been built with reinforced concrete so far, there is

image text in transcribed
The canton of Zurich plans a wildlife bridge with a timber structure. As such structures have been built with reinforced concrete so far, there is no experience with maintenance, repair and failure of such structures in the cantonal administration. Experts worry that undetected penetration of water into the structure from the soil cover (on top of the bridge) might lead to rotting timber and eventually failure of the entire structure, The suggest frequent inspections or additional sealing To this aim, they developed two different variants of the bridge: Variant 1 "PBD only": A timber structure with a PBD sealing based on bitumen. Variant 2 "PBD & UHFB" : A timber structure with a PBD sealing and an additional thin layer of UHFE (high performance fibre reinforced concrete). The expected costs for both variants are given below. The interest rate for discounting is 2% The expected service life is 50 years. Variant 1: PBD only construction costs (KCHF): 6'500 (occurrence: year 0) maintenance (KCHF): 7 (frequency: annually starting year 1) Inspections (kCHF): 18 (frequency: annually starting year 1) renovation (kCHF): 300 (occurrence: year 25) minor repairs (KCHF): 9 (frequency: every two years starting year 2) Variant 2: PBD & UHFC construction costs (kCHF): 6'700 (occurrence: year 0) maintenance (KCHF): 7 (frequency: annually starting year 1) inspections (KCHF): 18 (frequency: every two years starting year 2) minor repairs (kCHF): 9 (frequency: every two years starting year 2) renovation (kCHF): 250 (occurrence: year 25) Answer the following questions. If calculations are required please respect the predefined units. You do not have to enter the units in your answer! Use always the unrounded values for the subsequent calculations! Pay attention to the convention for the signs! a. What is the net present value (NPV) for variant 1 "PBD only" [KCHF]? b. What is the annuity (a) for variant 1 "PBD only" [kCHF]? c. What is the net present value (NPV) for variant 2 "PBD & UHFC" [KCHF]? d. What is the annuity (a) for variant 2 "PBD & UHFC" [KCHF]

Step by Step Solution

There are 3 Steps involved in it

Step: 1

blur-text-image

Get Instant Access to Expert-Tailored Solutions

See step-by-step solutions with expert insights and AI powered tools for academic success

Step: 2

blur-text-image_2

Step: 3

blur-text-image_3

Ace Your Homework with AI

Get the answers you need in no time with our AI-driven, step-by-step assistance

Get Started

Recommended Textbook for

Financial Accounting Tools For Business Decision Making

Authors: Paul D. Kimmel,  Jerry J. Weygandt,  Jill E. Mitchell

10th Edition

1119791081, 978-1119791089

More Books

Students also viewed these Accounting questions

Question

What type of office space and equipment are provided?

Answered: 1 week ago