Question
The Cebu City plans to increase the capacity of her existing water transmission lines. Two plans are under consideration. Plan A requires the construction of
The Cebu City plans to increase the capacity of her existing water transmission lines. Two plans are under consideration. Plan A requires the construction of a parallel pipeline, the flow being maintained by gravity. The initial cost is P151,582,222 and the life is 40 years, with an annual operating cost of P6,350,911 for the 1st 20 years and P14,898,843 for the next 20 years. Plan B requires the construction of a booster pumping station costing P100M with the life of 40 years. The pumping equipment cost an additional amount of P25M, it has a life of 20 years and a salvage value of P2M. The annual operating cost is P5M. Using the Present Value (PV) Method and an interest of 22% cpd. annually, what is the PV of Plan A?
Step by Step Solution
There are 3 Steps involved in it
Step: 1
Get Instant Access to Expert-Tailored Solutions
See step-by-step solutions with expert insights and AI powered tools for academic success
Step: 2
Step: 3
Ace Your Homework with AI
Get the answers you need in no time with our AI-driven, step-by-step assistance
Get Started