Question
The Chair of the Operations Management Department at Quality University wants to construct a p-chart for determining whether the four faculty teaching the basic P/OM
-
The Chair of the Operations Management Department at Quality University wants to construct a p-chart for determining whether the four faculty teaching the basic P/OM course are under control with regard to the number of students who fail the course. Accordingly, he sampled 100 final grades from last year for each instructor, with the following results:
Instructor Number of Failures A 13 B 0 C 11 D 16 What are the .95 (5% risk of Type I error) upper and lower control limits for the p-chart?
.95 and .05
.13 and .07
.1588 and .0412
.16 and .04
.1774 and .0226
2.)The Chair of the Operations Management Department at Quality University wants to construct a p-chart for determining whether the four faculty teaching the basic P/OM course are under control with regard to the number of students who fail the course. Accordingly, he sampled 100 final grades from last year for each instructor, with the following results:
Instructor | Number of Failures |
A | 13 |
B | 0 |
C | 11 |
D | 16 |
Using .95 control limits, (5% risk of Type I error), which instructor(s), if any, should he conclude is (are) out of control?
none | ||
Prof. B | ||
Prof. D | ||
both Prof. B and Prof. D | ||
all |
Step by Step Solution
There are 3 Steps involved in it
Step: 1
Get Instant Access to Expert-Tailored Solutions
See step-by-step solutions with expert insights and AI powered tools for academic success
Step: 2
Step: 3
Ace Your Homework with AI
Get the answers you need in no time with our AI-driven, step-by-step assistance
Get Started