The chief engineer of refinery operations is not satisfied with the preliminary design for storage tanks to be used as part of a plant expansion
- The chief engineer of refinery operations is not satisfied with the preliminary design for storage tanks to be used as part of a plant expansion programme. The engineer who submitted the design was called in and asked to reconsidfer the overall dimensions in the light of an article in the Chemical Engineer, entitled How to size future process vessels?
The original design submitted called for 4 tanks 5.2 m in diameter and 7m in height. From a graph of the article, the engineer found that the present ratio of height to diameter of 1.35 is 111% of the minimum cost and that the minimum cost for a tank was when the ratio of height to diameter was 4:1.
The cost for the tank design as originally submitted was estimated to be $ 9,000,000. What are the optimum task dimensions if the volume remains the same as for the original design? What total savings may be expected through the redesign?
Step by Step Solution
There are 3 Steps involved in it
Step: 1
Get Instant Access to Expert-Tailored Solutions
See step-by-step solutions with expert insights and AI powered tools for academic success
Step: 2
Step: 3
Ace Your Homework with AI
Get the answers you need in no time with our AI-driven, step-by-step assistance
Get Started