Answered step by step
Verified Expert Solution
Link Copied!

Question

00
1 Approved Answer

The company produces carrots at three plants, which are delivered to two customers via two warehouses. Shipments between plants are allowed after the packaging has

The company produces carrots at three plants, which are delivered to two customers via two warehouses. Shipments between plants are allowed after the packaging has been completed. This also applies to between the warehouses and between the customers. The cost of producing the carrots at each plant is different. As a result, the company is concerned with both production and shipping costs while meeting customer demands. The production capacity of each plant {in tonnes per year), the product cost at each plant {in dollars per tonnes), and the customer demand {in tonnes per year) are summarised in the table below: The management has set the maximum flow for each route to be 150 tonnes. Since sometimes the demands are fluctuated, the company plans to have safety stock of 60 and 50 tonnes at Warehouses 1 and 2 respectively. Based on the information above, the management wants you to design a network flow solution for their strategic plan to minimise the total costs that can meet the demands. Any change in the current scenario (e.g. plant capacities or route capacities) can be proposed if it is reasonable and based on the findings in your analysis (e.g. optimal solution, sensitivity analysis, and alternative optimal solutions). The management expects you to submit a technical report for deciding alternatives as well as for documenting the models for future use. Please ensure that the report is written in a professional format and the spreadsheet model is in a working condition.

 



Step by Step Solution

There are 3 Steps involved in it

Step: 1

blur-text-image

Get Instant Access with AI-Powered Solutions

See step-by-step solutions with expert insights and AI powered tools for academic success

Step: 2

blur-text-image

Step: 3

blur-text-image

Ace Your Homework with AI

Get the answers you need in no time with our AI-driven, step-by-step assistance

Get Started

Recommended Textbook for

Materials Science and Engineering An Introduction

Authors: William D. Callister Jr., David G. Rethwisch

8th edition

978-0470419977

Students also viewed these General Management questions