Question
The condensed form of Nordstrop Company's flexible budget for manufacturing overhead follows: CostMachine-HoursFormulaOverhead Costs(per machine-hour)5,5006,5007,500Variable cost$1.15$6,325$7,475$8,625Fixed cost8,8008,8008,800Total overhead cost$15,125$16,275$17,425 The following information is available for
The condensed form of Nordstrop Company's flexible budget for manufacturing overhead follows:
CostMachine-HoursFormulaOverhead Costs(per machine-hour)5,5006,5007,500Variable cost$1.15$6,325$7,475$8,625Fixed cost8,8008,8008,800Total overhead cost$15,125$16,275$17,425
The following information is available for a recent period:
- The denominator activity of 5,500 machine-hours was chosen to compute the predetermined overhead rate.
- At the 5,500 standard machine-hours level of activity, the company should produce 2,200 units of product.
- The company's actual operating results were as follows:
Number of units produced2,500Actual machine-hours6,500Actual variable overhead costs$7,930Actual fixed overhead costs$9,000
Required:
1.Compute the predetermined overhead rate and break it down into variable and fixed cost elements.(Round your answers to 2 decimal places.)
2.What were the standard hours allowed for the year's actual output?(Do not round intermediate calculations.)
3.Compute the variable overhead spending and efficiency variances and the fixed overhead budget and volume variances.(Do not round intermediate calculations. Round your answers to 2 decimal places. Indicate the effect of each variance by selecting "F" for favourable, "U" for unfavourable, and "None" for no effect (i.e., zero variance).)
Step by Step Solution
There are 3 Steps involved in it
Step: 1
Get Instant Access to Expert-Tailored Solutions
See step-by-step solutions with expert insights and AI powered tools for academic success
Step: 2
Step: 3
Ace Your Homework with AI
Get the answers you need in no time with our AI-driven, step-by-step assistance
Get Started