Question
The District of Columbia wants the City Engineer to evaluate three (3) alternatives for supplementing the Citys water supply as follows: ? Alternative 1: Continue
The District of Columbia wants the City Engineer to evaluate three (3) alternatives for supplementing the Citys water supply as follows:
? Alternative 1: Continue deep well pumping at an annual cost of $10,500.
? Alternative 2: Install an eighteen (18) inch diameter pipe from the surface reservoir.
The initial cost for this is $25,000, with an annual pumping cost of $7,000. ? Alternative 3: Install a twenty-four (24) inch diameter pipe from the surface reservoir. The initial cost for this is $34,000, with an annual pumping cost of $5,000. Assumptions: MARR = 8%. Economic life = 20-years. Alternatives 2 and 3 salvage value = 10% of initial cost. Each Alternative is equally effective in meeting the District of Columbias increased water needs. Determine which alternative the City Engineer should recommend.
Step by Step Solution
There are 3 Steps involved in it
Step: 1
Get Instant Access to Expert-Tailored Solutions
See step-by-step solutions with expert insights and AI powered tools for academic success
Step: 2
Step: 3
Ace Your Homework with AI
Get the answers you need in no time with our AI-driven, step-by-step assistance
Get Started