Question
The Dubuque Cement Company packs 80-pound bags of concrete mix. Time-study data for the filling activity are shown in the following table. Because of the
The Dubuque Cement Company packs 80-pound bags of concrete mix. Time-study data for the filling activity are shown in the following table. Because of the high physical demands of the job, the company's policy is a
23%
allowance for workers. (Round all intermediate calculations to two decimal places before proceeding with further calculations.)
Performance | Observation (seconds) | |||||||||||
Element | Rating | 1 | 2 | 3 | 4 | 5 | ||||||
Grasp and place bag | 115 | % | 9 | 9 | 8 | 10 | 6 | |||||
Fill bag | 80 | % | 36 | 40 | 40 | 34 | 110 | * | ||||
Seal bag | 105 | % | 15 | 16 | 12 | 21 | 19 | |||||
Place bag on conveyor | 85 | % | 8 | 6 | 8 | 29 | ^ | 34 | ^ |
* Bag breaks open; included as delay in the allowance factor
^ Conveyor jams; included as delay in the allowance factor
Part 2
a) The standard time for this process = 82.2482.24 seconds (round your response to two decimal places).
Part 3
b) The number of observations that are required for a 95% confidence level within 5% accuracy = ___ enter your response here observations (round your response up to the next whole number).
Step by Step Solution
There are 3 Steps involved in it
Step: 1
Get Instant Access to Expert-Tailored Solutions
See step-by-step solutions with expert insights and AI powered tools for academic success
Step: 2
Step: 3
Ace Your Homework with AI
Get the answers you need in no time with our AI-driven, step-by-step assistance
Get Started