Answered step by step
Verified Expert Solution
Link Copied!

Question

1 Approved Answer

The Electrotech Corporation manufactures two industrial-sized electrical devices: generators and alternators. Both of these products require wiring and testing during the assembly process. Each generator

image text in transcribed
The Electrotech Corporation manufactures two industrial-sized electrical devices: generators and alternators. Both of these products require wiring and testing during the assembly process. Each generator requires 2 hours of wiring and 1 hour of test- ing and can be sold for a $250 profit. Each alternator requires 3 hours of wiring and 2 hours of testing and can be sold for a $150 profit . There are 260 hours of wiring time and 140 hours of testing time available in the next production period and Elec- trotech wants to maximize profit. a. How much excess wiring and testing capacity exists in the optimal solution? b. What is the company's total profit if it has 10 additional hours of wiring capacity? c. By how much does the profit on alternators need to increase before their pro- duction is justified? d. Does the optimal solution change if the marginal profit on generators decreases by $50 and the marginal profit on alternators increases by $75?" e. Suppose the marginal profit on generators decreases by $25. What is the maxi- mum profit that can be earned on alternators without changing the optimal solution? 1. Suppose the amount of wiring required on alternators is reduced to 1.5 hours. Does this change the optimal solution? Why or why not? dtv

Step by Step Solution

There are 3 Steps involved in it

Step: 1

blur-text-image

Get Instant Access to Expert-Tailored Solutions

See step-by-step solutions with expert insights and AI powered tools for academic success

Step: 2

blur-text-image

Step: 3

blur-text-image

Ace Your Homework with AI

Get the answers you need in no time with our AI-driven, step-by-step assistance

Get Started

Recommended Textbook for

Evaluation Of Maternal Deaths Audit Activities In Mulanje District

Authors: John Nepiyala

1st Edition

3330069562, 978-3330069565

More Books

Students also viewed these Accounting questions

Question

Compute the derivative f(x)=1/ax+bx

Answered: 1 week ago

Question

What is job enlargement ?

Answered: 1 week ago

Question

what is the most common cause of preterm birth in twin pregnancies?

Answered: 1 week ago