The Electrotech Corporation manufactures two industrial-sized electrical devices: generators and alternators. Both of these products require wiring and testing during the assembly process. Each generator

The Electrotech Corporation manufactures two industrial-sized electrical devices: generators and alternators. Both of these products require wiring and testing during the assembly process. Each generator requires 2 hours of wiring and 1 hour of testing and can be sold for a $250 profit. Each alternator requires 3 hours of wiring and 2 hours of testing and can be sold for a $150 profit. There are 260 hours of wiring time and 140 hours of testing time available in the next production period and Electrotech wants to maximize profit.

a. Formulate an LP model for this problem.

b. Sketch the feasible region for this problem.

c. Determine the optimal solution to this problem using level curves

1- How many decision variables? 2- Identify the decision variables. 3- State the objective function. 4- State the constraints. 5- Identify any upper or lower bounds. 6- Create a spreadsheet model for this problem and solve it using Solver. 7- What is the optimal solution?

Step by Step Solution

There are 3 Steps involved in it

Step: 1

blur-text-image

Get Instant Access to Expert-Tailored Solutions

See step-by-step solutions with expert insights and AI powered tools for academic success

Step: 2

blur-text-image

Step: 3

blur-text-image

Ace Your Homework with AI

Get the answers you need in no time with our AI-driven, step-by-step assistance

Get Started

Recommended Textbook for

Clinical Audit In Oral Pathology Laboratory A Wide Range Of Quality Improvement

Authors: Rudra Bhardwaj, Narendra Nath Singh, Sherin Nair

1st Edition

3330343052, 978-3330343054

More Books

Students also viewed these Accounting questions

Question

Find the derivative of the function. h(x) = (x 11 - 1) 3 h'(x) = =

Answered: 1 week ago