THE EXTRA CREDIT PROBLEM (20%) This is the extra credit question. Absolutely no consultation between students is allowed. There will be no credit if there is evidence of consultation. All questions should be directed to the instructor. FH in the blanks with your numbers in bold red. During the recent computer crash the BOM file for an end-item A has been totally erased and several entries from the MRP tables pertaining to the components have been erased, too. It is, however, known that A uses only two sub-items (Components B and C). Being a smart GVSU graduate, you are assigned the task of reconstructing these tables/BOM files. Specifically: a) Complete the Gross requirement row for component A. 4 points b) What lot-sizing rule is used for Component A? (e.g., EOQ = ? or L4L or POQ= ?). 1 Point c) For component B, complete the table using EOQ rule. Use EOQ = ? lead-time for B = 3 weeks. 5 points d) Complete the table for C using lot for lot and Lead-time=1 week. 5 points e) Construct the Product Structure (or BOM file) diagram for A. 10 points a. Partially Filled MRP Table for Item A. Complete it (i.e., fill in all blanks)! Leadine ? | 7 5 | 6 Letsizing Rule Item>> A PD | 1 | 2 | 3 | 4 | Gross Requirements Scheduled Receipts_ 0 5 0 Projected on-hand 200 100 10 Net Requirements 701 Planned Order Receipts 0 Planned Order Releases 101200 100 b. Partially Filled MRP Table for Item B. Complete it! Text Shape Media Comment Naring Ral p PD Gross Reglement Scheduled Recept Prebe Net ed Order Recipe Paned Order Rele M 300 c. Partially Filled MRP Table for Item C. Complete it! Lasing Rak LL C PD Cross Reguir Sched Rese Projected and Net Requirements Planned Order Recelas Planned Order Releases THE EXTRA CREDIT PROBLEM (20%) This is the extra credit question. Absolutely no consultation between students is allowed. There will be no credit if there is evidence of consultation. All questions should be directed to the instructor. FH in the blanks with your numbers in bold red. During the recent computer crash the BOM file for an end-item A has been totally erased and several entries from the MRP tables pertaining to the components have been erased, too. It is, however, known that A uses only two sub-items (Components B and C). Being a smart GVSU graduate, you are assigned the task of reconstructing these tables/BOM files. Specifically: a) Complete the Gross requirement row for component A. 4 points b) What lot-sizing rule is used for Component A? (e.g., EOQ = ? or L4L or POQ= ?). 1 Point c) For component B, complete the table using EOQ rule. Use EOQ = ? lead-time for B = 3 weeks. 5 points d) Complete the table for C using lot for lot and Lead-time=1 week. 5 points e) Construct the Product Structure (or BOM file) diagram for A. 10 points a. Partially Filled MRP Table for Item A. Complete it (i.e., fill in all blanks)! Leadine ? | 7 5 | 6 Letsizing Rule Item>> A PD | 1 | 2 | 3 | 4 | Gross Requirements Scheduled Receipts_ 0 5 0 Projected on-hand 200 100 10 Net Requirements 701 Planned Order Receipts 0 Planned Order Releases 101200 100 b. Partially Filled MRP Table for Item B. Complete it! Text Shape Media Comment Naring Ral p PD Gross Reglement Scheduled Recept Prebe Net ed Order Recipe Paned Order Rele M 300 c. Partially Filled MRP Table for Item C. Complete it! Lasing Rak LL C PD Cross Reguir Sched Rese Projected and Net Requirements Planned Order Recelas Planned Order Releases