The facility is McCormick Hockey Rink (179 Broad Avenue) in Toronto. Perform the frequency modelling for hazardous outcome sequences and risk estimation for each hazardous

The facility is McCormick Hockey Rink (179 Broad Avenue) in Toronto. Perform the frequency modelling for hazardous outcome sequences and risk estimation for each hazardous outcome sequence. Given Data:

Notes: Due to some recent incidents with ammonia-based refrigerants, the city has asked that the geographic risk to local houses be kept below 10-6/yr and that the risk inside the area and compressor room be kept to 10-4/year. Analyze the risk and determine controls to meet these targets. Undertake a Cost Benefit Analysis of your recommendations. You will need to estimate a cost will leave it up to you to do this (not expecting this to be an emphasis of the work, but should be in the right order of magnitude). Assume the following (cumulative) costs for human injuries: - Death: $10,000,000 - Serious Injury: $1,000,000 - Minor Injury: $50,000

Additional Information - The facility operates year round - Assume that maintenance staff do rounds in the mechanical room for 2 hrs/day, 7 days/week when in operation - Assume ventilation in the arena is 2 ACH (air changes/hr) and in mechanical room is 8 ACH - Assume the main arena is in use 8 hrs/day with an average of 100 people - Ammonia systems are closed look and so assume there is no need to add or remove any on a regular basis Design information - P & I D provided (not the actual arenas) - Address provided for looking up on Google Earth or otherwise - Check MSDS for ammonia to assess hazards

image text in transcribed

FLER COLD BRINE EXPANSION TANK An in USA RELE UNE RINK FLOOR Beya Y SERIEHET LES 2 EVAPORATIVE CONDENSER (OT) WWE 100% BUTT 11STA Y OTWA. CE1 CE DORONY 08 HO HONRY ELEFB STT PA 6 w EXISTING CONDENSER. CONDENSING AT 92F SURGE DRUM 20 VOOR SAPORU 1-1/4" OD MATNI 4 SPAD. VOT TYP:) SHELL & TUBE BRINE CHILLER **** 19-NIL OFF3.81 * 90 PS/ TU. DRAWING NOTES CUBA MEDEL HO ye OM OnP 1-1/4 H Hoa cc . NOTE DAWN HICH PRESSURE FLOAT ASSEMBLY HWIN SUPPLY HEADS we de LOW DWS GTON JT 21-1/2 VEN BRINE COOUNG PUMP MOB: 500 e OUT 100 1314. Que TO 20P MOTOR, 17 a//02 $ FRAME & PLATE HEAT RECOVERY HEAT EXCHANGER MOUNTED OUTDOORS AT HIGH LEVEL, GRAVITY RETURN TO EXISTING EVAPORATIVE CONDENSER. GLYCOL LOOP CIRCULATION PUMP C/W VSD CONTROL 3) PRESSURE RELIEF VALVE (2) SET AT 60 PSI, 4) WELL TYPE TEMPERATURE SENSOR CONNECTED TO DDC SYSTEM. TYPICAL OF 4. 5) EXISTING REFRIGERATION ISOLATION VALVES IN AMMONIA REFRIGERANT UNE. REMOVE SECTION OF PIPE & CAP OFF. REFER TO CONNECTION DETAIL ON DWG. HR-M3. NEW 2% ISOLATION VALVES. BYPASS VALVE - NORMALLY CLOSED EXCEPT WHEN SERVICING HT RECOVERY SYSTEM. EXISTINC ICE MAKING REFRIGERATION SYSTEM CHILLER SYSTEM --------- EXISTING REFRIGERATION SYSTEM

Step by Step Solution

There are 3 Steps involved in it

Step: 1

blur-text-image

Get Instant Access to Expert-Tailored Solutions

See step-by-step solutions with expert insights and AI powered tools for academic success

Step: 2

blur-text-image

Step: 3

blur-text-image

Ace Your Homework with AI

Get the answers you need in no time with our AI-driven, step-by-step assistance

Get Started

Recommended Textbook for

Bioprocess Engineering Basic Concepts

Authors: Michael L. Shuler, Fikret Kargi

2nd Edition

0130819085, 978-0130819086

More Books

Students also viewed these Chemical Engineering questions

Question

Describe cooling and leakage drag.

Answered: 1 week ago