Answered step by step
Verified Expert Solution
Question
1 Approved Answer
The figure below shows a heat exchanger with no phase change. The Process in stream comes from upstream units and you can only measure its
The figure below shows a heat exchanger with no phase change. The "Process in" stream comes from upstream units and you can only measure its flow (Fi) and temperature (Ti) but you cannot change these values. CTS is the cooling water from the cooling tower and CTR is the return of the cooling water to the cooling tower. You can readjust the flow (Fw) of the cooling water if needed. The control objective is to keep the "Process out" stream at a target temperature Ts. (a) Considering the variables Fi, Ti, Fo, To and Fw; What is/are the disturbance/s and the manipulated variable/s? (b) Show how you can control this heat exchanger in order to meet the control objective
Step by Step Solution
There are 3 Steps involved in it
Step: 1
Get Instant Access to Expert-Tailored Solutions
See step-by-step solutions with expert insights and AI powered tools for academic success
Step: 2
Step: 3
Ace Your Homework with AI
Get the answers you need in no time with our AI-driven, step-by-step assistance
Get Started