Answered step by step
Verified Expert Solution
Link Copied!

Question

1 Approved Answer

The informations below of the longitudinal section were taked at each (100m) the road is construct with width (8m), the elevation of the first

 

The informations below of the longitudinal section were taked at each (100m) the road is construct with width (8m), the elevation of the first point for the road is (20m) and slopping (-0.5%) and the side slope (2V 3H). Draw the profile and the grade line, then calculate the volume of cut and fill? Station Ground level 0+00 17.55 1+00 18.8 2+00 18.45 3+00 19.35 4+00 20.15

Step by Step Solution

There are 3 Steps involved in it

Step: 1

blur-text-image

Get Instant Access to Expert-Tailored Solutions

See step-by-step solutions with expert insights and AI powered tools for academic success

Step: 2

blur-text-image

Step: 3

blur-text-image

Ace Your Homework with AI

Get the answers you need in no time with our AI-driven, step-by-step assistance

Get Started

Recommended Textbook for

Introduction to Operations Research

Authors: Frederick S. Hillier, Gerald J. Lieberman

10th edition

978-0072535105, 72535105, 978-1259162985

More Books

Students also viewed these Civil Engineering questions