The order quantity is 7500. The Reject rate is 1%. Material: A108 (Medium steel) Material Cost: $2.05/lb, not including GST Scrap Cost: $0.13/lb including GST
The order quantity is 7500. The Reject rate is 1%. Material: A108 (Medium steel) Material Cost: $2.05/lb, not including GST Scrap Cost: $0.13/lb including GST Material Density: 0.285 lb/in3 Material Diameter: 3.00 in Order Quantity: 7500 Assuming that each part manufactured will require a 0.0625" SAW CUT and 2 0.125" FACING CUTS. Show all work. Question 1 (3 marks) For the drawing below, ID (list) the labor processes required to manufacture the part. Provide a short written rationale behind your list. The following machinery is available: Horizontal Bandsaw. Lathe. HAAS VF4 Mill (8000 rpm) All holes in the parts are to be processed in the mill. Material is supplied as 03 in X 20 ft. long round bars
Step by Step Solution
There are 3 Steps involved in it
Step: 1
Get Instant Access to Expert-Tailored Solutions
See step-by-step solutions with expert insights and AI powered tools for academic success
Step: 2
Step: 3
Ace Your Homework with AI
Get the answers you need in no time with our AI-driven, step-by-step assistance
Get Started