Question
The process capability ratio Cp is __________________ the process capability index Cpk a.Always strictly greater than b.Sometimes equal to c.Always strictly less than d.Unrelated to
The process capability ratio Cp is __________________ the process capability index Cpk
a.Always strictly greater than
b.Sometimes equal to
c.Always strictly less than
d.Unrelated to
Scalpel manufacturing requires several steps, one of which is the sharpening of the cutting edge. This is done on a special grinder and it takes 18 seconds per scalpel for the grinding operation. The company has 6 such grinders which work in parallel. The cycle time for this process is
a.2.7 seconds
b.18 seconds
c.3.0 seconds
d.6 seconds
Calls arrive at a call center at an average rate of 100/min. Depending on the availability of a service representative, calls may be either answered immediately or wait in line for the next available representative. On average, including waiting time, a call requires 4.4 minutes. How many callers, on average are in the system at any given time? Assume that there are no dropped calls because of excessive waiting.
a.44
b.440
c.4.4
d.Not enough information
Bleeding Edge Technologies makes surgical scalpels which are supplied to medical equipment suppliers in boxes. The weekly demand for the scalpels from the distributors is 1000 boxes. The Bleeding Edge factory works two (2) 8-hour shifts daily, 5 days a week. In each shift the workers are given a 30-minute paid lunch break during which no production occurs. The takt time for scalpel boxes is:
a.6.72 minutes
b.6.3 minutes
c.4.5 minutes
d.4.8 minutes
The design gap in service quality is the
a.Gap between the service delivered and customer perception
b.Gap between the customer's expectation and the management's understanding of it
c.Gap between the management's understanding of customer expectation and the service standard
d.Gap between the service standard and service delivered
The bullwhip effect is the
a.Variability in demand observed because of seasonality
b.Turmoil caused in organizations due to rapid changes implemented by managements
c.The variability in the operations competence as one moves upstream in the supply chain
d.The amplification of variability as the demand signal moves upstream in the supply chain
Process drift in six-sigma is related to
a.The tendency for the process mean to shift, over time, from its nominal value
b.The loss of strategic focus after a period of continuous improvement
c.Maintaining the gains made with implemented solutions
d.Problems associated with correctly estimating the variability of a process.
The daily demand for a part is normally distributed with mean of 100 and standard deviation of 10 and no safety stock is maintained. The result is:
a.Stockouts will occur 50% of the time during the lead time.
b.Exactly half of the demand during the lead time will be satisfied.
c.The entire demand during the lead time will be satisfied.
d.There will not be any stockouts during the lead time.
Step by Step Solution
There are 3 Steps involved in it
Step: 1
Get Instant Access to Expert-Tailored Solutions
See step-by-step solutions with expert insights and AI powered tools for academic success
Step: 2
Step: 3
Ace Your Homework with AI
Get the answers you need in no time with our AI-driven, step-by-step assistance
Get Started