The project was originally built in 1979 and has been vacant with utilities disconnected since 2017. The project was originally purchased as a starter home but may become an income property in the future. The owner is requiring a lot line to lot line refresh of the property. There are potential permits required to reconnect the utilities, but there is no major structural or mechanical additions or deletions expected. The suggested project budget is $50,000. The suggested project timeline is 6 weeks. Yard - Will be cleared of overgrown vegetation, and all debris, then install of ground cover. Roofing - will be removed of gravel, locate problem areas, make necessary repairs. Perform complete roof maintenance, repair penetration seals, around skylights, parapet flashing, and canals. Apply aluminum protective coating at all repairs. Exterior / Stucco /Paint-Exterior wall repair will consist of stucco repair and patch, trim repair, full synthetic stucco paint, and trim paint. Interior/ Drywall / Paint - Drywall will be repaired, wallpaper removed, trim replaced, door hardware replaced, wall and ceiling paint. Flooring - Tear out existing flooring, debris removal. Installation of ceramic tile throughout house, except for installation of carpet in bedrooms. Kitchen - Tear out existing cabinetry/soffit, sink, appliances, debris removal, install new cabinetry (shaker door), granite counter tops, under mounted sink and new appliances, install backsplash. Bathrooms - Tear out existing tub, shower, toilets, vanities/sinks, accessories. Install new tub, shower, toilets, vanities/sinks, accessories, back splash. Electrical - Install power source and switches for ceiling fans at living room. Install light fixture boxes at master bedroom and living room. Reconnect services at electrical service panel. Windows - Remove existing and install new bedroom window. Doors - Replace damaged interior bedroom doors. Remove existing sliding door and Install new exterior French door bedroom. Remove existing sliding door/ Install new barndoor in sunroom. Lighting - Remove existing and install new exterior lighting. Remove existing and install new interior Model 91551 boring Vendor 761 SF Lowes set mortar Lowes ded grout Lowes pet 360 SF Home Depot pet Pad 360 SF Home Depot 10650136 29325 14121-262-1200 202561286 Page Item/SKUN Quantity Unit Cost Material Cost Labor Hours Hourly Rate Labor Cost 591551 5 5 12955 10 $ 5 37682 3 $ $ 10041030239 5 5 150553446-39 5 $ $ $ 5 5 $ 5 s 5 Page 2 15 $ $ $ $ $ 5 $ $ $ 5 $ Total Material Cost Total Labor Cos The project was originally built in 1979 and has been vacant with utilities disconnected since 2017. The project was originally purchased as a starter home but may become an income property in the future. The owner is requiring a lot line to lot line refresh of the property. There are potential permits required to reconnect the utilities, but there is no major structural or mechanical additions or deletions expected. The suggested project budget is $50,000. The suggested project timeline is 6 weeks. Yard - Will be cleared of overgrown vegetation, and all debris, then install of ground cover. Roofing - will be removed of gravel, locate problem areas, make necessary repairs. Perform complete roof maintenance, repair penetration seals, around skylights, parapet flashing, and canals. Apply aluminum protective coating at all repairs. Exterior / Stucco /Paint-Exterior wall repair will consist of stucco repair and patch, trim repair, full synthetic stucco paint, and trim paint. Interior/ Drywall / Paint - Drywall will be repaired, wallpaper removed, trim replaced, door hardware replaced, wall and ceiling paint. Flooring - Tear out existing flooring, debris removal. Installation of ceramic tile throughout house, except for installation of carpet in bedrooms. Kitchen - Tear out existing cabinetry/soffit, sink, appliances, debris removal, install new cabinetry (shaker door), granite counter tops, under mounted sink and new appliances, install backsplash. Bathrooms - Tear out existing tub, shower, toilets, vanities/sinks, accessories. Install new tub, shower, toilets, vanities/sinks, accessories, back splash. Electrical - Install power source and switches for ceiling fans at living room. Install light fixture boxes at master bedroom and living room. Reconnect services at electrical service panel. Windows - Remove existing and install new bedroom window. Doors - Replace damaged interior bedroom doors. Remove existing sliding door and Install new exterior French door bedroom. Remove existing sliding door/ Install new barndoor in sunroom. Lighting - Remove existing and install new exterior lighting. Remove existing and install new interior Model 91551 boring Vendor 761 SF Lowes set mortar Lowes ded grout Lowes pet 360 SF Home Depot pet Pad 360 SF Home Depot 10650136 29325 14121-262-1200 202561286 Page Item/SKUN Quantity Unit Cost Material Cost Labor Hours Hourly Rate Labor Cost 591551 5 5 12955 10 $ 5 37682 3 $ $ 10041030239 5 5 150553446-39 5 $ $ $ 5 5 $ 5 s 5 Page 2 15 $ $ $ $ $ 5 $ $ $ 5 $ Total Material Cost Total Labor Cos